My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-12-27 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2006
>
2006-12-27 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2006 7:59:42 AM
Creation date
12/22/2006 12:54:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
View images
View plain text
<br />Anoka County Contract No.2006-0SS8 <br /> <br />within its power to secure such funding including pursuing special <br />appropriations from the legislature if it appears feasible. <br /> <br />14. As the City of Centerville has a population of less than 5000 people, the <br />City shall pay zero percent (0%) of the cost of construction and <br />installation of the whole traffic actuated signal system at CSAH S4 <br />(including County supplied materials). <br /> <br />15. The County shall pay one hundred percent (100%) of all interconnect <br />costs. <br /> <br />16. The City shall pay one hundred percent (100%) of Emergency Vehicle <br />Pre-emption (EVP) costs. The City's estimated cost for EVP is $7,500.00. <br /> <br />17. The City shall pay their share of mobilization and field office for City <br />non-participating items. The City's estimated cost of these items is <br />$35,750.00 <br /> <br />18. The City shall pay their share of traffic control for City non-participating <br />items. The City's estimated cost of these items is $4,750.00 <br /> <br />19. The total estimated construction cost to the City for the project is <br />summarized below: <br /> <br />1 Construction and Adjustment of Local Utilities <br />2 Grading, Base and Bituminous <br />3 Storm Sewer <br />4 Detention Basins (included in Storm Sewer) <br />5 Concrete Curb & Gutter <br />6 Decorative Medians <br />7 Streetscape Features <br />8 Driveways <br />9 Concrete Sidewalk <br />10 Trails <br />11 Street Lights (included in Streetscape) <br />12 Traffic Signals <br />13EVP <br />14 Mobilization, Field Office <br />15 Traffic Control <br /> <br />Total Estimated Share of Construction Cost to the City <br />Estimated Federal Funds available to the City <br />Total Cost less Federal Funds <br /> <br />Total Construction Cost to City <br /> <br />5 <br /> <br />$397,050.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$115,222.00 <br />$0.00 <br />$500,000.00 <br />$0.00 <br />$97,617.25 <br />$484,777.50 <br />$0.00 <br />$0.00 <br />$7,5000.00 <br />$35,750.00 <br />$4,750.00 <br /> <br />$1,642,666.75 <br />$468,793.00 <br />$1,173,874.07 <br /> <br />$1,173,874.07 <br /> <br />~s.,o <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).