My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-01-02 P & Z Packet
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2022
>
2007
>
2007-01-02 P & Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2007 4:00:47 PM
Creation date
12/28/2006 11:39:49 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />City of CenterviIIe <br />Planning and Zoning Commission <br />December 2, 2006 <br /> <br />to be completed and the neighbor will need to approve the location of the fence so the <br />other side can be maintained. <br /> <br />Ms. Essex stated that she does not feel her neighbor would cooperate and asked about the <br />location of a hedge. <br /> <br />City Administrator Larson stated that the hedge cannot be put on the boulevard and <br />adequate sight lines will need to be maintained at the end of her driveway. <br /> <br />Commissioner Klennert-Hunt arrived at 6:40 p.m. <br /> <br />Mayor Capra asked Mr. Larson to provide Ms. Essex with information on mediation <br />services available through the County. <br /> <br />III. PUBLIC HEARING(S) <br /> <br />1. Sedona Homes - Preliminary Site Plan & Conditional Use Permit Request <br /> <br />Chair Hanson opened the public hearing at 6:41 p.m. <br /> <br />City Administrator Larson stated that this public hearing needs to be repeated because <br />proper notices about the hearing were not published last month. He stated that the City <br />Attorney had submitted a memo to the Commission regarding items that he would like <br />Sedona Homes to address. <br /> <br />Mr. Paul Keleher, Chief Manager for the project, explained the plans for the site. Mr. <br />Keleher stated that they plan for a 30,000 sq. ft. office building for a single tenant, <br />located near the Public Works building. He presented a landscape plan that will screen <br />the properties on the west with 6 to 7 foot spruce trees in a staggered row. He stated that <br />at the south end, the property will be screened also with 6 to 7 foot spruce trees in a triple <br />staggered row. He stated that the project meets all C-l codes, but they are asking for a <br />variance to the building height. He introduced Architect Mr. Mike Thomas and Civil <br />Engineer Mr. Brian Bourassa. <br /> <br />Chair Hanson reviewed items from the City Attorney's letter that he felt needed to be <br />addressed: <br /> <br />A. Issue regarding blending of styles of buildings, and use of buildings as a buffer <br /> <br />Mr. Thomas stated that to keep the roof height down, they have planned a flat roof line <br />and due to the size of the building, they could not use a wood structure and plan to use <br />precast concrete. He stated that they have tried to tie the buildings together with colors, <br />using earth tones and also using cultured stone on the front of the new building, similar to <br />the existing townhome buildings. He stated that the canopy and columns on the new <br />building will be white to match the existing canopies. <br /> <br />Page 2 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.