Laserfiche WebLink
<br />APPENDIX A <br />Cost Estimate <br />CSAH 14 Water Main <br /> <br />Item Description <br />12" HOPE water main - directional drill <br />6" PVC water main <br />12" gate valve <br />Valve rod extension <br />Hydrant w/valve <br />Connect to existing 8" PVC <br />Fittings <br />Clearing and grubbing <br />Traffic control <br />1" Copper service <br />1" Copper service - directional drill <br />1 " curb stop and box <br />1 " corporation stop <br /> <br />Unit Qty Unit Price <br />LF 2600 40.00 <br />LF 50 25.00 <br />EA 3 1,000.00 <br />EA 6 150.00 <br />EA 3 2,000.00 <br />EA 1 600.00 <br />LB 2000 1.50 <br />LS 1 500.00 <br />LS 1 2,000.00 <br />LF 100 12.00 <br />LF 200 20.00 <br />EA 11 75.00 <br />EA 11 75.00 <br />Subtotal <br />10% Contingencies <br />TOTAL Construction Cost <br />20% Eng., Inspec., Admin. <br />TOTAL PROJECT <br /> <br />Total Price <br />$104,000.00 <br />$1,250.00 <br />$3,000.00 <br />$900.00 <br />$6,000.00 <br />$600.00 <br />$3,000.00 <br />$500.00 <br />$2,000.00 <br />$1,200.00 <br />$4,000.00 <br />$825.00 <br />$825.00 <br />$128,100.00 <br />$12,810.00 <br />$140,910.00 <br />$28,182.00 <br />$169,092.00 <br />