Laserfiche WebLink
<br />TABLE 1 <br />Cost Breakdown <br />Peltier Lake Drive Cost Analysis <br />City of Centerville <br />260-090-10 <br /> <br /> <br /> SCHEDULE -1.0 PEL TIER LAKE DRIVE STREET WORK <br />1 REMOVE BITUMINOUS PAVEMENT SY 5550 2.00 11100.00 <br />2 REMOVE BITUMINOUS CURB & GUITER LF 3080 1.00 3080.00 <br />3 MILL BITUMINOUS PAVEMENT SF 540 4.00 2160.00 <br />4 COMMON EXCAVATION CY 1050 4.00 4200.00 <br />5 SUBGRADE EXCAVATION CY 4400 6.00 26400.00 <br />6 SELECT GRANULAR BORROW CY 4400 9.00 39600.00 <br />7 4" DRAINTILE LF 3080 3.00 9240.00 <br />8 GEOTEXTILE FABRIC SY 6240 1.50 9360.00 <br />9 CLASS 5 AGGREGATE BASE TN 2100 6.00 12600.00 <br />10 TYPE 41A, WEAR COURSE MIXTURE TN 475 23.00 10925.00 <br />11 TYPE 31B, BASE COURSE MIXTURE TN 475 21.00 9975.00 <br />12 BITUMINOUS MATERIAL FOR TACK COAT GAL 275 1.00 275.00 <br />13 B-618 CONCRETE CURB & GUTIER LF 3080 8.00 24640.00 <br />14 6" CONCRETE DRIVEWAY APRONS SY 152 28.00 4256.00 <br />15 BITUMINOUS DfW RESTORATION SY 260 12.00 3120.00 <br />16 CONCRETE DfW RESTORATION SY 45 28.00 1260.00 <br />17 SODDING SY 2800 2.00 5600.00 <br />18 SUBGRADE DENSITY TEST, IN-PLACE EA 3 40.00 120.00 <br />19 CLASS 5 GRADATION TEST EA 1 65.00 65.00 <br />20 CLASS 5 PROCTOR TEST EA 1 85.00 85.00 <br />21 CLASS 5 DENSITY TEST, IN-PLACE EA 3 40.00 120.00 <br />22 CONCRETE AIR ENTRAINMENT TEST EA 3 50.00 150.00 <br />23 CONCRETE SLUMP TEST EA 3 50.00 150.00 <br />24 CYLINDERS (3EA) EA 3 50.00 150.00 <br />T SCHEDULE -1.0 TOTAL $ 178,631.00 <br />