My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-10-17 CC
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2001
>
2001-10-17 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2007 9:19:32 AM
Creation date
1/19/2007 8:32:03 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Contract Unit Quantity Amount <br />No. Item Unit Quantity Price to Date to Date <br /> Part 1 - Electrical <br />1 Mobilization lS 1 756.31 1 $756.31 <br />2 Seeding with topsoil and mulch AC 0.1 2166.63 0.1 $216.66 <br />3 1-1/2" PVC Conduit, Sch. 80 IF 1175 5.68 1199 $6,804.68 <br />4 3/4" RSC Conduit IF 240 20.83 240 $4,998.65 <br />5 2" RSC Conduit IF 20 16.22 35 $567.68 <br />6 #10 AWG Wire IF 1320 1.58 1407 $2,228.97 <br />7 #8 AWG Wire IF 2000 1.50 2064 $3,086.71 <br />8 #4 AWG Wire IF 1600 1.81 1674 $3,030.78 <br />9 000 AWG Wire IF 60 20.33 150 $3,049.95 <br />10 3 Conducutor #3/0 Type USE Cable IF 170 9.19 270 $2,482.35 <br />11 600 Amp 120/240V PanelBoard with breakers EA 1 5369.75 1 $5,369.75 <br />12 200 Amp 120/240V Panelboard with breakers EA 1 2109.39 1 $2,109.39 <br />13 100 Amp 120/240V load Center with breakers EA 1 959.27 1 $959.27 <br />14 600 Amp fused disconnect switch EA 1 3542.24 1 $3,542.24 <br />15 600 Amp metering cabinet EA 1 3058.24 1 $3,058.24 <br />16 400 Amp metering cabinet EA 1 1297.54 1 $1,297.54 <br />17 Power Distribution Receptacles EA 5 648.77 5 $3,243.86 <br />18 lighting Cabinet with relays and switch lS 1 3542.24 1 $3,542.24 <br />19 Misc. fittings, boxes, connectors, etc. lS 1 4975.10 1 $4,975.10 <br />20 Trench Excavation and Backfill IF 1000 3.78 1372 $5,188.29 <br /> Total Part 1 - Electrical $60,508.67 <br /> Part 2 - Skate Park <br />21 6" concrete pavement Irregular width SY 1700 33.76 1700 $57,397.44 <br />22 Common excavation CY 200 27.94 362 $10,113.95 <br />23 Granular borrow CY 120 100.69 150 $15,103.26 <br />24 Seeding with topsoil and mulch AC 0.1 2166.63 0.1 $216.66 <br /> Total Part 2 - Skate Park $82,831.32 <br /> Alternate No.1 <br />25 4' diameter storm CBMH EA 5590.20 $5,590.20 <br /> Total Alternate NO.1 $5,590.20 <br /> <br />Total Part 1 - Electrical <br />Total Part 2 - Skate Park <br />Total Alternate NO.1 <br />Total Work Completed To Date <br /> <br />$60,508.67 <br />$82,831.32 <br />$5,590.20 <br />$148,930.18 <br /> <br />6160111BREQ2.xls <br />
The URL can be used to link to this page
Your browser does not support the video tag.