Laserfiche WebLink
<br />. ' <br /> <br />RICE CREEK WATERSHED DISTRICT <br />3585 N LEXINGTON AVE STE 330 <br />ARDEN HILLS MN 55126-8056 <br />PH# 651-766-4191 FX# 651-766-4196 <br /> <br />PERMIT NUMBER: 98-61 <br />c: City of Centerville <br />District Engineer <br />RCWD Inspector <br />RCWD File <br /> <br />AMENDED PERMIT <br /> <br />Pursuant to the Rules and Regulations of the Rice Creek Watershed District and the District policies and <br />standards, and based upon the statements and information contained in the permit application, letters, <br />maps, and plans submitted by the applicant and other supporting data, all of which are made a part hereof <br />by reference, permission is hereby granted to the applicant named below to conduct the activity <br />described below: <br /> <br />Name of Applicant (Permittee) Project name Surety Amount County <br />Terminal Eagan II, LLC Terminal Truck $2,000.00 Anoka <br />Attn: Brent Coatney Maintenance <br />Address (No. & Street, City, State, Zip code) <br />6812 20th Av S, Centerville, MN 55038 <br />Phone # 's I Fax I Cell Phone I Misc. <br />(651) 407-6200 (651) 407-6300 <br />Authorized to / PUJpose of Project: <br />Final Site Drainage Plan for a commercial building and bituminous parking lot, 6.62= acres in <br />accordance with Grading and Utility Plan prepared by Paramount Engineering, dated May 26, <br />1998, rec'd May 26, 1998 and parking lot expansion plan & detail sheet prepared by Metro Land <br />Surveying & Engineering, Inc., dated 9/20/01, rec'd 10/3/01. <br />Property Locatioll Date of Issuance Expiration Date <br />Northeast comer of Cedar Street and County Road 54, 10/9/01 4/8/03 <br />Centerville <br /> <br />This permit is granted subject to the following GENERAL and SPECIAL PROVISIONS: <br /> <br />GE~RAL PROVISIONS <br />1. The project shall be in accordance with',the plans most recently submitted and approved by the <br />District as part ofthe record of this project.' <br /> <br />2. Erosion control measures shall be adequately designed for the site characteristics. They may include <br />staked haybales, diversion channels, sediment ponds, or sediment fences. They shall be installed in <br />accordance with "Protecting Water Quality in Urban Areas-Best Management Practices for <br />Minnesota." MPCA, October 1989, prior to commencement and shall be maintained throughout the <br />project. All exposed soil shall be stabilized as soon as possible and no later than 14 days after the <br />completion of the grading. The District Inspector may require Permittee to provide additional <br />erosion control measures beyond those included in the approved plan at his discretion when site <br />conditions warrant. <br /> <br />3. The soils erosion and sediment controls for the rough grading phase of the project must be installed <br />prior to any grading operations. The District Inspector must be notified when the initial erosion <br />controls are installed and prior to any grading operations (651-766-4191). <br /> <br />4. Upon completion of the project and stabilization of all graded areas, all temporary erosion controlS <br />shall be removed. <br />