My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-09-26 CC
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2001
>
2001-09-26 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2007 9:43:08 AM
Creation date
1/19/2007 9:41:56 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, <br /> <br /> <br />~~ <br /> <br /> <br /> <br />Motion by Ms. Brenner and seconded by Mr. Travis to approve the set agenda as noted. <br />1Vlotion carried unanimously. <br /> <br />PETITIONS AND COMPLAINTS <br /> <br />None <br /> <br />UNFINISHED BUSINESS <br /> <br />Special Use Permit (SUP) - Kindergarten Center Rehbein Properties, LLC <br />:Mr. Gerald Rehbein (Rehbein Properties, LLC) was present to request SUP approval for a <br />kindergarten center north of Main Street on 20th Avenue. The Council discussed adding <br />contingencies to the proposed SUP. Specifically, the Council requested the SUP include a chain <br />link fence to buffer the playground from the ponding area. <br /> <br />lVlotion by Mr. Sweeney and seconded by Ms. Nelson to approve the Special Use Permit <br />and to incorporate a chain link fence to buffer the playground area from the pond. Motion <br />carried unanimously. <br /> <br />'-tVater Interconnect <br />:Mr. Peterson gave a progress report on the water interconnect between the cities ofLino Lakes <br />and Centerville. Mr. Peterson explained a Joint Powers Agreement (JPA) dated March 20, 1998 <br />was drafted to connect the 70-ft distance between the current pipes. Furthermore, during a phone <br />conversation, Mr. John Powell (Lino Lakes Engineer) stated the Lino Lakes Council is in <br />agreement with the current draft copy of the contract and it is ready to be signed. Mayor <br />Wilharber mentioned the document was not signed because of the associated cost and ultimate <br />control of the interconnect. :Mr. Palzer noted both cities elected to have a telemetry system which <br />was a costly feature. Mr. Peterson referred to a 1998 feasibility report which indicated the <br />telemetry system cost nearly $55,000. <br /> <br />The Council directed Staff and the Engineer to work with Lino Lakes staff to arrive at an <br />agreement and bring the issue before the Council. <br /> <br />Cedar Street Park <br />MT. March updated the Council on Ceder Street Park. The County requires tax forfeiture <br />property to be sold at the current market value. Therefore, if the City elects to transfer the park <br />designation to another use, then the City will be expected to pay the fair market value for the <br />parcel. Mr. March noted no action is required since the update was for informational purposes <br />only. <br /> <br />NEW BUSINESS <br /> <br />Special Use Permit (SUP) - Goetz Landscaping and Irrigation <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.