My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-09-26 CC
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2001
>
2001-09-26 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2007 9:43:08 AM
Creation date
1/19/2007 9:41:56 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />60NESTROO AND ASSOC i16516361311 09/21/01 16:18 B :02/03 NO:579 <br />. <br /> Conll'lct Unit Qu.mlt~ Amount <br />No. Item Unll Quantity Prle. to Dale ta Oats <br /> Part 1 - Eltctrlcal <br />1 MObilization LS 71515.31 $758,31 <br />2 Seedln; with topsoil and mulch AC 0.1 2166.63 0.1 $216.56 <br />3 1.1/2" ~C Conduit, Seh, eo L.F 1115 5.68 1199 $6,804.68 <br />4 3/4' RSC Conduit LF 240 20.83 240 $4,998.85 <br />5 :2" RSC Conduit L.F 20 16.22 35 $56r.Sa <br />6 N10 AWG Wire LF 1320 1.58 1407 $2,228,97 <br />7 #8 ,l,WG Wire LF 2000 1.50 2064 $3,08671 <br />B #4 AWG Wire LF 1eOO 1.81 1674 53,030.78 <br />9 00.0 AWG Wire LF 60 20.33 150 $3,049.95 <br />10 3 ClInduculClr #3JO Tyr;e USE Cable LF 170 9.19 270 52.482.315 <br />11 800 Amp 120/240V PanelBoard with breakers EA 1 S36e. TS 1 55,369,75 <br />12 200 .Amp 120/240V Paneiboard with breakers EA 1 210e.3S 1 $2,109,39 <br />13 100 Amp 120n40V Load CenterWlth breskers EA 1 959.27 1 $959.27 <br />14 600 Amp fuBed disconnect switch SA 1 3642.24 1 $3.542,24 <br />1a 600 Amp metering cabinet EA 1 3058.~4 1 $3,058,24- <br />16 400 Amp met.ring cabinet f,A 1 121i17.54 1 $1,297.54 <br />'''I Power DlslI'lbutlon Receptecles EA 5 &41.l.77 5 $3,2-43.e6 <br />" <br />1e Ughllna Cabinet with relavs and switch LS 1 3~2.24 1 $3.542.24 <br />19 Miic. fittings, be_, ccnnectorl, etc, L.S 1 4975.10 1 $4, 1iI75.1 0 <br />20 Trench Excavation 3nd Backfill LF 1000 3.78 1372 $5,188,29 <br /> Total Part 1 . EI8C'J1cal $aO,eo8.67 <br /> Part 2 . SQle Park <br />21 e" concrete ptlvemllol irregular width Sy 1700 33.78 1700 $57,397.4-4 <br />22 Common excavation CV 200 0'17,94 392 $10.113.96 <br />23 Granular borrow CV 120 10o.ee 150 $15,103.26 <br />24 Seeding with topsoil and mulch AC 0.1 2166.63 0.1 $216.66 <br /> Tolal Pert 2. Skate Park $82,831.32 <br /> Altemate No. 1 <br />26 4' diameter storm CSMH EA 5590.20 $5,500,20 <br /> Total Alternate No.1 $6.590.20 <br /> <br />TOISI Part 1 . Electrical <br />Totil Part 2. Skate ~ark <br />Total Alternate NO.1 <br />Total WorK Completed To Oale <br /> <br />Sao,SOU7 <br />$82.831.32 <br />f1S,590.20 <br />$148,930.18 <br /> <br />~ 1~111llREQ:l,.", <br />
The URL can be used to link to this page
Your browser does not support the video tag.