Laserfiche WebLink
<br />1. Coordinate with the utility companies to provide for gas main, <br />telephone lines, cable television lines, and power lines to service <br />the properties developed on the fmal plat according to the City's <br />, joint trench policy. <br /> <br />ll. Provide seeding and vegetation maintenance and erosion control <br />over denuded or graded ar~as and mitigation area, at the City's <br />direction. <br /> <br />lll. Establish lot corner monumentation within 60 days of grading <br />completion or within 180 days after filing the final plat, whichever <br />IS sooner. <br /> <br />IV. Provide such street maintenance and control ofbuilder's actions to <br />maintain roadways clear of mud, soil, and debris to provide safe <br />driving surfaces. The Developer shall provide street sweeping <br />within 24 hours of the City's request for such services. <br /> <br />v. Provide for landscaping in accordance with the City ordinances <br />and other requirements. <br /> <br />The Developer shall accomplish or cause to be accomplished these actions <br />according to generally accepted trade standards. The Developer will cause <br />to be furnished to the City a schedule of proposed operations at least five <br />days prior to commencement of the construction activities. <br /> <br />b. Site Grading, Street Construction and Building Permits. No certificate of <br />occupancy shall be issued without installation of bituminous base course <br />across the front lot line of that property. No building penrut shall be <br />issued for any lot without the finished grading in accordance with the <br />approved grading plan. Furthermore, only two (2) building permits will <br />be issued prior to installation of the bituminous base course, which permits <br />shall be at the discretion of the City, to allow for emergency vehicle <br />access. <br /> <br />c. Erosion Control. The Developer shall control erosion insuring: <br /> <br />1. The Developer shall submit an erosion control plan, detailing all <br />erosion control measures to be implemented during construction. <br />Said plan shall be approved by the City prior to the <br />commencement of site grading or construction. <br /> <br />ll. Erosion and siltation control measures shall be coordinated with <br />the different stages of development. Appropriate control measures <br />as required by the City shall be installed prior to development <br />when necessary to control erosion. <br /> <br />3 <br />