My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-09-26 CC
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2001
>
2001-09-26 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2007 9:43:08 AM
Creation date
1/19/2007 9:41:56 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />pagle Pass <br />, . <br />'De'velopment Agreement <br /> <br />B. STREET AND UTILITY IMPEDVEl\tffiNTS. In accordance with the policies and <br />ordinances of the City, the following described improvements (hereinafter collectively called <br />the ';Street fLl1d Utility L'11provements"), to include improvements as described by the plans, <br />specifications, and contract dcy,::umems entilkd Eagle Pass Streets and Utilities, as prepared <br />by the Ciry' Engineer, MSA Consulting Engineers, and as adopted and approved by the City <br />Council of the City of Centerville. Said improvements shall be constructed and installed by <br />the City to serve the Subdivision on the terms and conditions according to Ordinance tl8, <br />Section 38.01, and other impr,)vemems specific to lile devdopment herein set forth: <br /> <br />1. Street Construction. The base course shall be completed before November ]2, 1996. <br />The wear course shall be completed before September 1, 1997, or when the City <br />deems appropriate according to the progress of w~rk on the individual lots. The <br />Developer shall be liable for any increase in cost for construction of the wear course <br />due to delays in construction on the individual lots. <br /> <br />A temporary turnaround shall be provided at the end of eagle Trail. To offset the cost <br />of the future street extension u1rough the Eagle Pass development, ll1e Developer shall <br />provide to the Ciry a cash escrow depo::;it in the sum of $1 ,850 to cover me cost of said <br />curb and gutter and street ex.tension, <br /> <br />2. Utility Oversizing. The City arld Developer agree that a portion of the sanitary sewer <br />and waterm<.iin has been installed with sufficie:m capacity to acconul1odate fumre <br />extensions to other area~ of the City. The City shall credit t.."1e Developer for the costs <br />above and beyond the sizes sufficient to acco1T'Jilodate the development. The credit <br />due the Develope:- at me time of filli'1.l plat approval is $20,000. A final credit due the <br />Developer will be calculated at the completion of the utility consrruction. <br /> <br />~. Construction Procf'dures. AU sllch improvements set out in Ordinance #8, Section <br />38.01, aDd as additionally specified herein shall be instituted, (;onstrLlcted, and <br />fina...rlced as fo Bows: <br /> <br />a. Tne Developer shall provide tv the City in writing an indication of the contracrof <br />selected by the Developer to construct and install the Street and Utility <br />Improvements. The City shall rese!'ve the right to determine if the contractOr <br />selected by the Devdoper is acceptable. The City reserves the right to require <br />satisfacrory proof of sClccessfi.ll experk.t:lce and adequate financial status by any <br />such contractor. <br /> <br />b. ConsI1uction shall not begin until written notice authorizing constlUction to start <br />is rectived by the Developer from the CilY. <br /> <br />C. Construction shalt be completed to the standards and specifications described in <br />the plans and specifications entitled Eagle Pass Streets and Utilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.