My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-08-08 CC Handouts
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2001
>
2001-08-08 CC Handouts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2007 11:55:53 AM
Creation date
1/19/2007 11:55:31 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2. SERVICES <br /> <br />The two properties at the end of Partridge Place (Phase 2) will have water service lines extended <br />10' into their property, at a cost to be absorbed by the development. The cost to extend sewer <br />and water to the Eide Property will be worked out between the developer and homeowner. <br /> <br />PROJECT COSTS <br /> <br />Detailed cost estimates of the proposed utilities and streets to serve Pheasant Marsh are included <br />in Appendix A at the back of the report. Unit prices are estimated based on recent, similar type <br />projects in the north metro area of the Twin Cities. The Total Project Cost is $1,938,007.00, <br />which includes 5% contingencies, and 30% indirect costs. Indirect costs include administrative, <br />engineering, interest, testing, inspection, and legal expenses. A summary of the estimated total <br />project costs is as follows: <br /> <br />Pheasant Marsh <br /> <br />Total <br /> <br />Sanitary Sewer <br />Water Main <br />Services <br />Storm Sewer <br />Streets <br />Total Project <br /> <br />Phase 1 <br />$186,978 <br />191,783 <br />35,572 <br />93,242 <br />287,356 <br />794,931 <br /> <br />Phase 2 <br />$23,041 <br />43,121 <br />46,505 <br />64,592 <br />303,221 <br />$480,480 <br /> <br />Phase3 <br />$69,225 <br />96,824 <br />47,147 <br />123,240 <br />326,160 <br />$662,596 <br /> <br />$279,244 <br />$331,728 <br />$129,224 <br />$281,074 <br />$916,737 <br />$1,938,007 <br /> <br />Estimated easement costs, which are not included in the summary above, are shown on Page 7. <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.