My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-05-09 CC
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2001
>
2001-05-09 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2007 3:07:36 PM
Creation date
1/19/2007 3:07:06 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />E-Mailed to Council on 5/3/01 at 11:34 a.m. <br />April 25, 2001 Council Minutes <br /> <br />X. CITY ENGINEER'S REPORT <br /> <br />1. Laurie LaMotte Memorial Park Electrical Plans <br /> <br />Mr. Peterson presented electrical plans for Laurie LaMotte Memorial Park for Council's <br />reVIew. <br /> <br />Mayor Swedberg questioned whether the City could tap into the electrical line at any <br />point if future wiring is determined. Mr. Peterson stated that the transformer is the most <br />viable starting point for same. <br /> <br />Mr. March questioned the purpose of the power-line crossing overhead versus under the <br />parking lot. Mr. Peterson stated that same was determined by Xcel Energy. Xcel Energy <br />suggested that burying feeder lines under asphalt was not a good idea due to potential <br />problems, accessibility and cost effectiveness. Mr. Peterson stated that he would contact <br />Xcel Energy to ascertain if they may have additional suggestions for the line. <br /> <br />Mr. March stated he would prefer under ground power, if possible, to preserve the <br />appearance of open space in the park. <br /> <br />Consensus was that the power line be placed underground depending upon cost. Mr. <br />Peterson stated that the power would be under ground subsequent to crossing the parking <br />lot. <br /> <br />Mr. Ray DeVine requested that Mr. March forward copies of the plans to the Parks and <br />Recreation Committee for their review. <br /> <br />Mr. March questioned whether the timeline for completing the project would be <br />jeopardized by waiting for input from the Parks and Recreation Committee. Mr. Peterson <br />stated that he could issue an addendum for up to five (5) days prior to the bid and did not <br />believe it to be a problem. <br /> <br />2'. Surface Water Management Plan Proposal <br /> <br />Mr. Peterson briefly reviewed the Surface Water Management Plan. <br /> <br />Mayor Swedberg clarified that the City is required to have a Surface Water Management <br />Plan that is complimentary to its Comprehensive Plan and, in order to do that, tasks 1 <br />through 6 need to be completed. Mr. March concurred. Mayor Swedberg questioned <br />whether Public Works Staff or Mr. Peterson would perform the other items contained in <br />the report. Mr. Peterson stated that he would develop a checklist and Public Works Staff <br />could complete some of the tasks to reduce expenditures. <br /> <br />Page 6 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.