My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-05-09 CC
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2001
>
2001-05-09 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2007 3:07:36 PM
Creation date
1/19/2007 3:07:06 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Project Assessments <br /> <br />The computation of the lateral component of the assessments is as follows: <br /> <br />21st Avenue - Street Assessment: <br />$193,820 x 1.1 x 1.3 = ($277,162.60-$138,581.30)/828.85 = 167.20/FF <br /> <br />Northern Light Boulevard - Street Assessment: <br />$73,480 x 1.1 x 1.3 = $105,076.40/562.55 = <br /> <br />186.79/FF <br /> <br />Storm Sewer Assessment: <br />($68,350 + $55,000) x 1.1 x 1.3 = <br />($176,390.50 - $49,693)/1391.4 = <br /> <br />91.06/FF <br /> <br />A summary of the Preliminary Assessment Roll is as follows: <br /> <br />Street <br /> <br />$382,243.73 <br /> <br />Storm Sewer <br /> <br />$176,393.88 <br />$558,637.61 <br /> <br />Total <br /> <br />Controversial Aspects <br /> <br />Due to the relatively small number of lots that will benefit from this project the <br />assessments per lot are very large. <br /> <br />Conclusion <br /> <br />The installation of the improvements considered in this report are feasible from <br />an engineering standpoint. The economic feasibility is to be determined by the <br />City Council and the residents proposed to be assessed. <br /> <br />Recommendations <br /> <br />We recommend the City proceed with the improvements as proposed. <br /> <br />6 <br /> <br />12292-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.