My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-05-09 CC
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2001
>
2001-05-09 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2007 3:07:36 PM
Creation date
1/19/2007 3:07:06 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. '. <br /> <br />agrees, through its departmental agencies, to cooperate to the fullest extent in the <br />protection of any excavations or barricades that may be necessary for the work performed <br />by Lino Lakes. <br /> <br />c. Lino Lakes agrees to notify and coordinate with businesses in Lots 7,8, <br />and 9 of the Centerville Industrial Park (along the existing gravel segment of 2151 <br />A venue) as early as practical the construction schedule of the Project. <br /> <br />2. Construction costs and design engineering shall be divided proportionally, <br />50% to Lino Lakes and 50% to Centerville, for the Project. Legal, administrative and <br />construction engineering costs shall be paid separately by each City. <br /> <br />3. Each city has the right to terminate Agreement prior to award of <br /> <br />construction contract. <br /> <br />4. Each municipality shall be solely responsible for their share of the costs of <br />the Project. Each municipality shall be responsible for the sale of bonds, if any, and levy <br />of special assessments against properties within their cities boundaries. <br /> <br />5. City of Lino Lakes shall receive, from the City of Centerville, monthly <br /> <br />. . <br />payments, as certain portions of the construction are completed. The Project amounts are <br />then due and payable for work completed. Upon completion of the entire Project, the <br />City of Lino Lakes shall prepare a final cost statement and submit it to the City of <br />Centerville. Payment of the statement shall be completed within 45 days upon receipt of <br />the statement. <br /> <br />6. Before this Agreement shall become binding and effective it shall be <br />approved by an appropriate resolution of the City Council of Lino Lakes and of the City <br />Council of Centerville, which shall be attached hereto as Exhibits Band C, respectively. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.