My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-04-11 CC
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2001
>
2001-04-11 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2007 9:28:56 AM
Creation date
2/8/2007 9:28:03 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The parties agree that realignment will be accomplished as set forth in Exhib it B. <br />Meredith shall assume the expense of notifying subscribers of the changed alignment of rhe PEG <br />channels, and any Meredith expense in changing literature, signs, vans, or other indicia of the <br />current channel location and the changed channel location of the PEG channels. <br /> <br />For purposes of this Memorandum, the following definitions apply: <br /> <br />"Universal PEG Service" shall be defined as the provision to a recipient, free of allY <br />charges, monthly or otherwise, of all of the following public, educational and governmemal access <br />channels (hereinafter "PEG access channels") designed in Exhibit B, attached hereto and made <br />a part hereof. <br /> <br />"Outler" shall be defmed as the cable and associated connectors which rum from me poim <br />of connection to the subscriber dweUing unit to the subscriber receiver. <br /> <br />"Standard Drop" shall be defined as the cable, not to exceed 250 fee~, which stall rUll <br />from the nearest connection point on the feeder cable of the Meredith system to the point of <br />connection to the subscriber dwelling unit. Standard Drop includes both aerial and underground <br />drops. <br /> <br />Should the subscriber require or request a converter, or other equipment not essential to <br />the reception of Uillversal PEG Service, or should the subscriber require additional Outlets or <br />Drops which are other Ll-Jan sta..T1dard, the subscriber will be responsible for the regulaled charges <br />for such services or equipment. Additional charges for drops which are other thaIl st2ndard shall <br />credit Lf}c expense of the first 250 feet of the drop. <br /> <br />Meredith shall. pass through in the PEG Fee portion of subscribers '. bills the cosrs.ofdesign <br />and tecimicaL recon.f1gurationof the Universal PEG Service in the additional amount 0 ffiv~( 5) <br />cents'permonth beginning January 1, 1996, See ExhibitC. Upon Meredith's activation and <br />provision of Universal Service and each year thereafter, Meredith shall provide the Commission <br />with a reconciliation of amcunts collected and expended related to this cost recovery and agree <br />r.,) an adjustment to the PEG Fee for any overpayment or underpayment. <br /> <br />Meredim shall provide an initial written notice to non-subscribers announcing the <br />availability of the Universal PEG Service. Meredith shall also mention the availability of the <br />Universal PEG Service periodically in other marketing, promotional, or infonTI:1tion materials to <br />non-subscribers and shall mention the Universal PEG Service in these materials at least quarterly. <br />Universal PEG Service will be included in any literature which lists all services generally <br />available from Meredith. Existing subscribers shall receive notice of the a.vailability of the <br />Universal PEG Service as a part of Meredich's notice concerning the channel line-up changes and <br />thereafter, at least annually. The Cornmission may promote the availability of Universal PEG <br />Service, and Meredith shall make available to the Commission during the first sixty (60) days of <br /> <br />5 <br /> <br />P.9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.