<br />2000 EDITION
<br />
<br />. fn~,~,7,!~ O?~~~~id')
<br />
<br />AlA DOCUMENT
<br />
<br />PROJECT:
<br />(Name and address)
<br />,.J~:COlJ~ty BanK::.
<br />:711J..?1stAve..North
<br />CentetViII~,: MN. {;5403.
<br />
<br />I
<br />
<br />G701-2000
<br />
<br />
<br />
<br />CHANGE ORDER NUMBER: 3 OWNER ~
<br />DATE: 3/15/01 ARCHITECT ~
<br />ARCHITECT'S PROJECT NUMBER: CONTRACTOR b
<br /> 10/18/00 0
<br />CONTRACT DA TE: FIELD
<br />CONTRACT FOR: General Construction OTHER 0
<br />
<br />. TO CONTRACTOR:
<br />CHaine 'and;addrm)':
<br />-'..."~~., ",,~,~,..,~". . ',..".~,~',>-,
<br />
<br />
<br />..;,~ ,<,',-.: ~- '.~.
<br /><,,'. Gre~oneCon~titiction CO;
<br />:.'122tE.-4thAve, 'Suite110
<br />...0~.~.:S6'~kO~, .M~ .5~~i9;~;;>.
<br />~~::~~{THE:cb~N T RA.CTI S CHX~ G E ri';:~FOLl OW5:. .;.::
<br />
<br />-. ~-".::JIl1du'!e/w~ere applicable, any wl~isputed mnou.nt attributable ~_o previollsly exectited C0t15lructio!'l Chat!ge Directives.)
<br />
<br />
<br />'~~',-,-~- _ c
<br />;'~ ''\' r -, '- -,._ .,,:;
<br />\.-' .":'0..:","";",<,_
<br />Additionalwatermainand hydrant work as required
<br />~r th~Jire m~al oJ.th-~City of~~te~ifl~~~'; ..:
<br />
<br />Add:
<br />
<br />12,477.00
<br />
<br />Add:
<br />
<br />1,248.00
<br />
<br />Theoriginal(Contract Sum~~e) was$:539,OOO.00
<br />Thenet cha~~e by previouslyauthorized Change Orders $ : 64,752:00
<br />. -
<br />
<br />The (Contract Sum) ~~ prior to this Change Order was $ 603,752.00
<br />
<br />The (Contract Sum) (~will be (in~{~ased) (~)
<br />~) by this Change Order in the amount of $ .13,725.00
<br />The new CC~ntract Sum) (~~~?i&) including thi~ Change Order will be $
<br />The Contr'lct Time will be (~~) (unchanged) by (
<br />4/16/01
<br />
<br />617,477.00
<br />o
<br />
<br />) days,
<br />
<br />The date of Substantial Completion as of the date of this Change Order therefore is
<br />
<br />NOTE: This Ch~nge Order d;es not include changes in the Contract Sum, Contr3ct Time or Guaranteed Maximum Price which
<br />have been authorized by Construction Change.Directive for. which the cost or lime are in dispule as described in Suhparagr3ph
<br />1.3.8 of AlA D?Cument MOL .
<br />
<br />Not valid until signed by the Architect, Contractor and Owner.
<br />
<br />Shea Architects, Inc,
<br />
<br />Greystone Construction Co'.
<br />
<br />The County Bank
<br />
<br />
<br />ARC H I TECT (Typed ""me)
<br />
<br />OWN E R (fyped 'I<I/IIe)
<br />
<br />
<br />(SignClture)
<br />
<br />CyiCv0 'f<'
<br />
<br />BY
<br />
<br />BY
<br />
<br />3.. "Lg . 0 ~
<br />DATE
<br />
<br />') -, 1.- ~ '" V' L
<br />
<br />DATE
<br />
<br />DATE
<br />
<br />, -----1
<br /><<J2000 The American Institute of Architects, Reproduction of the material herein or substantial quotation of its
<br />provisions without written permission of the AlA violates the copyright laws of the United States and will subject
<br />the violator to legal prosecution.
<br />WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution.
<br />
<br />~t'
<br />
<br />
<br />.'. ~,. ....
<br />"."
<br />--
<br />
<br />@2000 AIA@
<br />AlA DOCUMENT G701-2000
<br />CHANGE ORDER
<br />
<br />The American Institute
<br />of Architects
<br />1735 New York Avenue, N.W.
<br />Washington, D.C 20006.5292
<br />
|