Laserfiche WebLink
<br />I- <br /> <br />I <br /> <br />I <br /> <br />INTRODUCTION <br /> <br />I <br /> <br />The City of Centerville ordered this report to evaluate the feasibility of extending water <br />main along Centerville Road and include streetscape improvements as part of the Design <br />Team vision for downtown. Approximately 20 parcels that currently obtain water from <br />private wells would have the option to connect to the City's water system. This would be <br />considered Phase 1 of an overall plan for redeveloping the entire downtown area, <br />encompassed by Westview Street on the north, Clearwater Road on the east, Heritage <br />Street on the south and Centerville Lake on the west. This report includes cost estimates, <br />timetables, assessments, and drawings of the proposed improvements. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Directly related to this proposed work is the Public Works property on the west side of <br />Centerville Road, between Sorel Street and Heritage Street. The City has been wanting <br />to upgrade Public Works, since the current facility is very old, worn out and inefficient. <br />Several other sites have been considered, including a new addition to City Hall. Once the <br />City decides on the future home for Public Works, the 1. I-acre site on Centerville Road <br />will be sold and redeveloped as part of the Downtown scheme. <br /> <br />I <br /> <br />I <br /> <br />This feasibility report addresses several issues the City faces as part of redeveloping the <br />downtown area: <br /> <br />I <br /> <br />· Water main installation to provide system looping and service to properties <br />· Streetscape amenities such as colored walk, paver bricks, benches and trees <br />· Period lighting to complement the Design Team Vision <br />· Anoka County requirements along CSAH 21 <br />· Assessment amounts that equal the benefit to properties <br /> <br />I <br /> <br />I <br /> <br />PROPOSED IMPROVEMENTS <br /> <br />I <br /> <br />The project limits along Centerville Road, from the north end (Westview Street) to the <br />south end (150' south of Heritage Street), have a total length of 1200 feet. It is proposed <br />to extend the water main this entire distance, while streetscape features will only be <br />constructed over 650 feet of the roadway (Main Street to Heritage). Figure 1 shows the <br />overall location of the improvements within the City of Centerville. <br /> <br />I <br /> <br />';:*~~~<'L~:i,.~,.':f,..~:,'_~:-t_~"'f'~,/~';,g..._,-<J;,:',~; --v(,J:":. "t,.,- ',.-," _~_ _h~ <br /> <br />.~,,'.-_"'- '-~''''11::!'~~'~'''''<'____~__,,_ <br /> <br />- <br />