My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-01-10 CC
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2001
>
2001-01-10 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2007 11:30:43 AM
Creation date
2/8/2007 11:29:09 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CENTENNIAL FIRE DISTRICT <br />JOINT POWERS AGREE11ENT <br /> <br />8.2 Steering Committee Budget Process. The Fire Chief shall submit an operating and <br />capital equipment budget to the Committee by July 1st of 1990, and each subsequent July <br />1st thereafter. The budget shall be submitted for the year 1992, in 1990 and for the next <br />year in subsequent years. The Committee shall then review the proposed budget and make <br />a recommendation to the member municipalities by October 1 st of 1990 and every <br />October 1st thereafter. Each municipality shall have until November 30, 1990 to adopt <br />the 1992 budget and each subsequent November 30 thereafter. !fall member <br />municipalities have not accepted the budget by November 30 in the appropriate year, the <br />committee will make an attempt to resolve outstanding issues and shall report back by <br />February 1st of the following year. The municipalities will then have from February 1st to <br />March 15 to approve the proposed budget. All new budgets must be agreed to by <br />all member municipalities, to become effective. <br /> <br />8.3 Base Budget. If by March 15 the municipalities in the District are unable to mutually <br />agree on the proposed budget for the upcoming year, the amount of the previous years <br />operating budget will be increased by the lesser of the following: <br />(a) The increase in the July, Minneapolis and St. Paul Consumer Price Index for All Urban <br />Consumers (Cpr-V) for the period ending most immediately prior to the commencement <br />of the budget year over the same index for the previous year. <br /> <br />or <br /> <br />(b) The increase in the most restrictive levy limit applicable to the budget year placed on <br />any of the member municipalities over the levy limit for that member municipality for the <br />pnor year. <br /> <br />In the event (a) or (b) decreases, the operating budget shall remain the same. The capital <br />expenditure contribution will, if there is no mutually agreed on number, revert to $100,000 <br />for the upcoming budget year. <br /> <br />SECTION IX <br />FUTURE FIRE STATION CONSTRUCTION <br /> <br />9.1 Procedure. Each municipality not having an existing fire hall meeting District standards; <br />as outlined in the addendum referred to below shall be responsible for the construction of <br />one (1) fire hall within its municipal borders which will be functional by December 31, <br />1992. Future fire stations beyond the minimum of one (1) will be located, with the <br />exception of common facilities. (The standard specifications will be outlined in an <br />addendum to this agreement to be supplied by the Fire District.) Common facilities such <br />as district offices and training centers shall be paid for in the same manner in which the <br />operating costs are presently assessed. Upon dissolution of the District, the municipality <br />wherein the facility is located shall be required to reimburse the remaining member <br />municipalities the costs they invested into the facility, minus depreciation based upon <br />straight line method Asset Depreciation Range. <br /> <br />Page # 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.