Laserfiche WebLink
<br /> Contract Unit Quantity Amount <br />No. Item Unit Quantity Price to Date to Date <br /> Part 1 - Site Work <br />1 Remove existing fence lS 1 $500.00 1 $500.00 <br />2 Remove bituminous pavement SY 40 $3.00 40 $120.00 <br />3 Sawing Bituminous Pavement IF 30 $3.00 30 $90.00 <br />4 Aggregate base TN 10 $25.00 207.8 $5,195.00 <br />5 Bituminous base course, Type 31 B TN 5 $80.00 5 $400.00 <br />6 Bituminous wear course, Type 41 B TN 5 $90.00 5 $450.00 <br />7 Granular borrow TN 36 $16.00 64.92 $1,038.72 <br />8 Topsoil borrow (LV) CY 50 $14.00 50 $700.00 <br />9 4" concrete sidewalk SF 110 $7.00 100 $700.00 <br />10 Sodding, lawn type SY 150 $5.00 $0.00 <br />11 Silt fence, regular LF 50 $4.00 50 $200.00 <br />12 Selective demolition, remove ex. pumps, <br /> valves and controls LS $2,500.00 $2,500.00 <br />13 72" diameter x 48" sanitary manholes addition EA $2,000.00 $2,000.00 <br />14 Plantings LS $200.00 $200.00 <br /> Total Part 1 - Site Work: $14,093.72 <br /> Part 2 - Lift Station Valve Vault and <br /> Controls. Option "A" <br />14 Valve vault and valves LS 1 $8.000.00 1.075 $8,600.00 <br />15 Buried fittings LB 350 $4.00 350 $1,400.00 <br />16 4" DIP forcemain LF 20 $110.00 20 $2.200.00 <br />17 Connect to existing force main LS 1 $2,600.00 1 $2,600.00 <br />18 Connect to existing wet well LS 1 $2,700.00 1 $2,700.00 <br />19 Submersible pumps, base bend, guide rails. <br /> and accessories with by-pass pumping LS $18,290.00 $18,290.00 <br />20 Lift station top slab with hatch LS $3,400.00 $3,400.00 <br />21 Lift station controls - Option "A" LS $20,800.00 $20,800.00 <br /> Total Part 2 - Lift Station Valve Vault and <br /> Controls - Option "A": $59,990.00 <br /> Change Order No.1 <br /> Connect to existing valve vault LS 3700 53.70000 <br />:2 [nstall 6" HOPE forcemain (directional bore- <br /> Peltier Lake Drive) LF 254 63 254 S 16.002.0ll <br />3 Install 6" HDPE forcemain (directional bore- <br /> Mill Road) LF 500 63 500 $31,500.00 <br />4 Fuse 6" pipes at intersection EA 1 2500 1 52,500.00 <br />5 Connect to existing manhole EA 1 1500 1 $1,500.00 <br />6 Type 3 I bituminous base course TN 25 60 10 5600.00 <br />7 Bituminous wear course. Type 41 TN 25 70 10 $700.00 <br />8 Souulng. IJwn type Sy 50 6 $0.00 <br /> Total Change Order NO.1 $56,502.00 <br /> Total Part 1 - Site Work: $14,093.72 <br /> Total Part 2 - lift Station Valve Vault and <br /> Controls - Option "A": $59,990.00 <br /> Total Change Order NO.1 $56,502.00 <br /> Total Work Completed To Date $130,585.72 <br /> <br />request 3 <br />