Laserfiche WebLink
<br />TABLE A-33-A-GRADING PLAN REVIEW FEES <br /> <br />.~I <br />I <br /> <br />.J cubic yards (38.2 m3) or less . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No fee <br />5110100 cubic yards (40 m3 to 76.5 m3) ........ .... ....... ....... ..... ............... .......0.0.0 $23.50 <br />lOl to l.000 cubic yards (77.2 m3 to 764.6 m3) .................. .... ......... ............. .......... 37.00 <br />l.001 1010,000 cubic yards (765.3 m3 to 7645.5 m3) ... . ... .. . . . .. . . .. . . .. . . " . . .. . . .. . . .. . . .. . . .. . . . . 49.25 <br />10.001 [0 100,000 cubic yards (7646.3 m3 10 76 455 m3)--549.25 for the fIrst 10,000 cubic yards (7645.5 m3). plus 524.50 for <br />."ch additlonal10,000 yards (7645.5 m3) or fraction thereof. <br />100.001 to :WO,OOO cubic yards (76456 m3 to 152 911 m3)--5269.75 for the fIrst 100,000 cubic yards (76 455 m3), plus 513.25 <br />for .acb additional 10,000 cubic yards (7645.5 m3) or fraction thereof. <br />200.001 cubic yards (152912 m3) or lllore-5402.25 for the first 200,000 cubic yards (152 911 m"). plus $725 for each addi- <br />tioQJII0,000 cubic yards (7645.5 m3) or fraction thereof. <br />Oilier fees: <br />Aacitional plan review tequired by cbanges, additions or revisions to approved plans ....... .0... 0"' S50.50 per hour' <br />(:;Jinimum charge--vne-half hour) <br /> <br />'e't :he total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supel"'oision, overhead, equipment, <br />hL'Urly wages and fringe benefIts of the employees involved. <br /> <br />I <br /> <br />TABLE A-33-B-GRADING PERMIT FEES' <br /> <br />I <br /> <br />5.) ,'ubic yards (38.2 m3) or less. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 523.50 <br />5l to 100 cubic yards (40 m3 to 76.5 m3) .0.. ....... .0....0.0.... .0.. ........ .... '0.0.0.. ........... 37.00 <br />10lto 1.000 cubic yards (77.2 m3 to 764.6 m3)--S37.00 for the rust 100 cubic yards (76.5 m3)plus S17.50 for each additional <br /> 100 cubic yards (76.5 m3) or fraction thereof. <br />1.001 to 10,000 cubic yards (765.3 [ll3 to 7645.5 m3)-S194.50 for the nrst 1,000 cubic yards (764.6 m3). plus 514.50 for each <br /> additional 1,000 cubic yards (764.6 m3) or fraction thereof. <br />10.001 [0100,000 cubic yards (7646.3 [ll3 to 76 455 m3)-5325.00 for the flIsr 10,000 cubic yards (7645.5 m3), plus 566.00 for <br /> eKb additional 10,000 cubic yards (7645.5 m3) or fraction thereof. <br />IOO.GOl ,"ubic yards (76 456 m3) ormore-5919.00 for the first 100,000cubic yards (76 455 m3), plus 536.50 for each addition- <br /> aIIO,OOO cubic yards (7645.5 m3) or fraction thereof. <br />Other Inspections and Fees: <br />1. Inspections outside of Dorma] business <br /> h0urs . . .. .. . . ., . . .. . . . . . . . . . . .. . . . . . . .. . . .. . . . . . . . . . . . . . . . . . . . . . . " . . .. . . .. . . . . . . S50.50 per hour" <br />, (nci.:!imum charg'-:wo hours) <br />Reinspection fees assessed under provisions of <br /> Se~:ioD 108.8 ........... ......-...... .... ........ ". -." ...... .... .,. -... ..... ..... 550.50 per hour" <br />3. Inspc~:ions for which no fee is specifically <br /> i.cdi~ll[ed ...... ......... ....-........ .......--. .... .......... .... ............ .-... S50.50 per hOLlr" <br /> -\tp\::imum charge-one-half hour) <br /> <br />:~~~ f.;- a ,,"rading permit authorizing additional work to that under a valid permit shall be the differeace her-veen the fee paid <br />fc-r me original permit and the fee shown for the entire project. <br /> <br />:"Jr th~ total hourly cost to the jurisdiction, whichever is the greatest. Tnis cost shall include supervision. overhead, equipment, <br />houri! wages and fringe benefits of the employees involved. <br /> <br />I <br /> <br />I <br /> <br />c" ~ <br /> <br />I <br />! <br /> <br />J <br />