<br /> Contract Unit Quantity Amount
<br />No. Item Unit Quantity Price to Date to Date
<br /> Part 1 - Sanitary Sewer - Centerville Road
<br />1 Mobilization LS 1 13500.00 0.5 $6,750.00
<br />2 Traffic control LS 1 2912.00 0.3 $873.60
<br />3 Shouldering aggregate TN 50 24.45 $0.00
<br />4 Clear and Grub Tree 2 500.00 2 $1,000.00
<br />5 Silt fence, regular LF 200 2.00 $0.00
<br />6 Remove and replace 36" CMP LS 1 1500.00 $1,500.00
<br />7 Salvage and replace gravel driveway TN 20 17.07 $0.00
<br />8 Connect to existing manhole EA 1 1500.00 1 $1,500.00
<br />9 12" PVC, SDR 35, 8'- 10' deep LF 250 28.09 250 $7,022.50
<br />10 12" PVC, SDR 35,10'-12' deep LF 175 28.09 175 $4,915.75
<br />11 12" PVC, SDR 35,12'- 14' deep LF 10 28.09 10 $280.90
<br />12 12" PVC, SDR 35,14'-16' deep LF 265 28.09 265 $7,443.85
<br />13 12" PVC, SDR 26, 16'- 18' deep LF 5 30.54 5 $152.70
<br />14 12" PVC, SDR 26,18' - 20' deep LF . 15 30.54 15 $458.10
<br />15 4' dia. sanitary manhole EA 1 1394.73 1 $1,394.73
<br />16 Manhole overdepth LF 3 99.97 3 $299.91
<br />17 Adjust MH frame and ring casting EA 1 150.00 $0.00
<br />18 Remove bituminous street SY 330 2.00 250 $500.00
<br />19 Patch bituminous street SY 330 15.92 $0.00
<br />20 Salvage and reinstall 12" CMP culvert LF 40 16.67 40 $666.80
<br />21 Improved pipe foundation LF 720 0.01 $0.00
<br />22 Fiber blanket on steep slopes SY 600 2.08 $0.00
<br />23 Seeding with topsoil and mulch AC 0.75 998.40 $0.00
<br /> Total Part 1 - Sanitary Sewer - Centerville Road $34,758.84
<br /> Part 2 - Water Main - Centerville Road
<br />24 Connect to existing 12" water main EA 1 750.00 1 $750.00
<br />25 12" PVC, C900 LF 1062 23.86 1062 $25,339.32
<br />26 8" PVC, C900 LF 35 16.71 35 $584.85
<br />27 6" PVC, C900 LF 50 14.24 50 $712.00
<br />28 8" gate valve and box EA 1 652.74 1 $652.74
<br />29 12" butterfly valve and box EA 3 851.33 3 $2,553.99
<br />30 Hydrant with gate valve and box EA 3 1899.17 3 $5,697.51
<br />31 Valve rod extension EA 7 143.49 $0.00
<br />32 Fittings LB 3000 1.15 2000 $2,300.00
<br />33 Improved pipe foundation LF 1100 0.01 $0.00
<br />34 Sodding SY 700 2.55 $0.00
<br />35 12" pipe restraint EA 20 69.64 20 $1,392.80
<br />36 8" pipe restraint EA 4 39.85 4 $159.40
<br />37 Seeding with topsoil and mulch AC 0.25 1018.64 $0.00
<br /> Total Part 2. Water Main - Centerville Road $40,142.61
<br /> Part 3 - Services - Centerville Road
<br />38 12" x 6" PVC wye EA 2 236.27 2 $472.54
<br />39 12" x 4" PVC wye EA 2 229.88 2 $459.76
<br />40 4" PVC, Schedule 40 service pipe LF 40 11.22 $0.00
<br />41 6" HDPE sewer service directional drill LF 156 42.02 $0.00
<br />42 4" PVC, Schedule 40 riser pipe LF 10 17.47 10 $174.70
<br />43 1" copper water service LF 90 8.59 $0.00
<br />44 1" copper service directional drill LF 400 9.39 $0.00
<br />45 Reconnect water service EA 1 178.76 $0.00
<br />46 Connect to existing sewer service EA 1 178.76 $0.00
<br />47 1" curb stop and box EA 6 132.51 $0.00
<br />48 1" corporation stop EA 7 143.16 $0.00
<br /> Total Part 3 - Services - Centerville Road $1,107.00
<br /> Part 4 - Sanitary Sewer - Hunters Crossing
<br />49 8" PVC, SDR 35, 18'- 20' deep - jacked LF 60 246.99 60 $14,819.40
<br />50 8" PVC, SDR 35,8'.10' deep LF 350 16.25 350 $5,687.50
<br />51 8" PVC, SDR 35,10'- 12' deep LF 900 18.37 900 $16,533.00
<br />52 8" PVC, SDR 35, 12'_ 14' deep LF 300 18.37 300 $5,511.00
<br />53 8" PVC, SDR 35, 14'- 16' deep LF 500 20.14 493 $9,929.02
<br />54 4' diameter sanitary manhole EA 9 1362.87 10 $13,628.70
<br />55 Manhole overdepth LF 56 99.97 50 $4,998.50
<br />Request #1
<br />
|