My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-09-13 CC
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2000
>
2000-09-13 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2007 3:49:39 PM
Creation date
2/8/2007 12:14:46 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MEMO <br /> <br />DATE: September 8, 2000 <br /> <br />TO : Honorable Mayor and Council <br /> <br />FROM: Jim March <br /> <br />RE : Storm Sewer Realignment - Lloyd Drilling (1873 Main Street) <br /> <br />............................................................................ <br /> <br />As you may recall, Council previously discussed a request from Lloyd Drilling for <br />permission to realign storm sewer that exists at the property across the street from City <br />Hall. The current storm sewer runs between the existing vacant commercial lot and the <br />existing home at 1873 Main Street. <br /> <br />At a previous meeting, Council chose not to grant this request until it was determined <br />whether or not a Rice Creek Watershed Permit would be required for this site. Included <br />in your packet is a memo from the RCWD stating that a permit would not be required for <br />the development of this site. The only reason a permit was required for the stripmall on <br />the west side of Peterson Trail is because a small area of wetland previously existed on <br />that site. <br /> <br />I would recommend that this request be approved. City Engineer Tom Peterson has <br />previously reviewed this proposed realignment. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.