My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-11-08 CC
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2000
>
2000-11-08 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2007 2:59:49 PM
Creation date
2/9/2007 12:24:07 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />17 <br /> <br />The estimated project costs include CDPD interfaces for 100 units. Approximately 40 <br />additional interface licenses will need to be purchased if all present users of mobile data <br />terminals migrate to use of laptops communicating over the COPD network. <br /> <br />The law enforcement departments that currently use mobile data terminals will also <br />need to buy the laptops and COPO modems, and other vehicle hardware required for <br />migrating to use of the COPO network with laptops. <br /> <br />Each user of the COPO network wiil also need to pay a charge of $50 per month per <br />laptop to AT&T for use of the network during the period that the CDPD network is used. <br /> <br />All of these costs are in addition to the estimated project cost figures that are included in <br />the 2001 capital budget for the mobile data system upgrade. <br /> <br />3.9 SCHEDULE <br /> <br />The plan for implementing the COPO data link as indicated in the 2001 capital budget <br />for the mobile data system upgrade shows a completion date of May 31,2001. It is <br />recommended that this upgrade to use the COPO network be accomplished at about <br />that time. <br /> <br />T~e PSSI computer-aided dispatch interface to the COPD network and the VisionAir <br />interface to the COPD network should also be completed by May 31 f 2001, so that <br />those systems will be ready when the cutover to the CDPD occurs. This will require that <br />both PSSI and VisionAir implement the TCP/IP communications protocol, and the <br />applications software for the computer-aided dispatch interface and the records <br />management interface also must be developed by that May 31, 2001 date. <br />The PSSI to VisionAir intersystem interface should also be completed by May 31,2001. <br />This will allow access to closed event history data, and allow the population of fields in <br />report formats as soon as the COPO system becomes available for use. <br /> <br />The upgrade of the interface with the State of Minnesota Criminal Justice Information <br />System and Criminal Justice Reporting System to use of the TCPIIP protocol should be <br />implemented as soon as VisionAir is able to accomplish this. The state requires that the <br />interface use TCPIIP on or before July 1, 2001. <br /> <br />Installation of the jail management and civil process software modules to the records <br />management system should be accomplished as soon as possible. <br />
The URL can be used to link to this page
Your browser does not support the video tag.