My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-11-20 CC
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2000
>
2000-11-20 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2007 1:23:53 PM
Creation date
2/9/2007 1:23:14 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Contract Unit Quantity Amount <br />No. Item Unit Quantity Price to Date to Date <br /> Part 1 - Site Work <br />1 Remove existing fence LS 1 $500.00 1 $500.00 <br />2 Remove bituminous pavement SY 40 $3.00 40 $120.00 <br />3 Sawing Bituminous Pavement LF 30 $3.00 $0.00 <br />4 Aggregate base TN 10 $25.00 207.8 $5,195.00 <br />5 Bituminous base course, Type 318 TN 5 $80.00 $0.00 <br />6 Bituminous wear course, Type 41B TN 5 $90.00 $0.00 <br />7 Granular borrow TN 36 $16.00 64.92 $1,038.72 <br />'3 Topsoil bcrrow (LV) CY 50 $14.00 $0.00 <br />9 4" concrete sidewalk SF 110 $7.00 100 $700.00 <br />10 Sodding, lawn type SY 150 $5.00 $0.00 <br />11 Silt fence, regular LF 50 $4.00 50 $200.00 <br />12 Selective demolition, remove ex. pumps, <br /> valves and controls LS $2,500.00 $2,500.00 <br />13 72" diameter x 48" sanitary manholes addition EA $2,000.00 $2,000.00 <br /> Total Part 1 - Site Work: $12,253.72 <br /> Part 2 . Lift Station Valve Vault and <br /> Controls. Option "A" <br />14 Valve vault and valves LS 1 $8,000.00 1.075 $8,600.00 <br />15 Buried fittings LB 350 $4.00 350 $1,400.00 <br />16 4" DIP forcemain LF 20 $110.00 20 $2,200.00 <br />17 Connect to existing force main LS 1 $2,600.00 1 $2,600.00 <br />18 Connect to existing wet well LS 1 $2,700.00 1 $2,700.00 <br />19 Submersible pumps, base bend, guide rails, <br /> and accessories with by-pass pumping LS $18,290.00 1 $18,290.00 <br />20 Lift station top slab with hatch LS $3,400.00 1 $3,400.00 <br />21 Lift station controls - Option "A" LS $20,800.00 0.2 $4,160.00 <br /> Total Part 2 - Lift Station Valve Vault and <br /> Controls - Option "A": $43,350.00 <br /> Change Order No.1 <br /> Connect [0 ~xjsting valve vault LS I 3700 S3,700.00 <br />7. Install 6" HDPE forcemain (directional bore- LF 254 63 S 16,002.00 <br /> Peltier Lake Drive) 254 <br />3 Install 6" HDPE forcemain (directional bore- LF 500 63 $3 1,500.00 <br /> Mill Road) 500 <br />4 Fuse 6" pipes at intersection EA I 2500 1 52,500.00 <br />5 Connect to existing manhole EA I 1500 1 $1,500.00 <br />6 Type 31 biruminous base course TN 25 60 50.00 <br />- Bituminous wear course, Type 41 TN 25 70 SO.OO <br />, <br />S Sodding, lawn type SY 50 6 SO.OO <br /> Total Change Order NO.1 $55,202.00 <br /> Total Part 1 - Site Work: $12,253.72 <br /> Total Part 2 - Lift Station Valve Vault and <br /> Controls - Option "A": $43,350.00 <br /> Total Change Order NO.1 $55,202.00 <br /> Total Work Completed To Date $110,805.72 <br /> <br />request 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.