Laserfiche WebLink
<br />EASEMENTS <br /> <br />Permanent and temporary easements will be necessary along Centerville Road, to install <br />the deep sanitary sewer. The sewer will be installed in the west boulevard from Center <br />Street to the south. A 12-foot wide permanent easement is needed from Larry and Alice <br />Woiak and from Charles Baumann. Temporary construction easements are also needed <br />from these two property owners. Small temporary easements may be necessary to extend <br />service pipes to the right-of-way line for several property owners along Centerville Road <br />(Greenwadt, Henrich, Zerwas). The developer should secure temporary easement' all <br />along the south side of the Hunters Crossing plat, since grading for the trail will encroach <br />on the property to the south. <br /> <br />Parcel Permanent Temporary Total <br />Description Property Easement Easement Estimated <br />SW 'A, Section 23 Owner SF Cost SF Cost Easement Cost <br />Parcel 13 Baumann 2,400 $1,800 3,000 $300 $2,100 <br />6903 Centerville Rd. <br />Parcel 18 W oiak 1,920 $1,440 2,400 $240 $1,680 <br />6923 Centerville Rd. <br />Parcel 4 Greenwadt 1,500 $150 $150 <br />6939 Centerville Rd <br />Parcel 5 Henrich 300 $30 $30 <br />6945 Centerville Rd <br />TOTAL $3,960 <br /> <br />FUNDING <br /> <br />Assessments are proposed to be levied against the benefitted properties along Centerville <br />Road. A preliminary assessment roll is included in Appendix B located at the back of <br />this report. Estimated assessments associated with lateral utility costs along Centerville <br />Road will be revised based on final project costs. <br /> <br />1. SANITARY SEWER <br /> <br />The lateral cost of sanitary sewer improvements along Centerville Road is proposed to be <br />assessed on a front-foot-basis. Lateral costs are defined as the equivalent cost for <br />extendi.ng 8-inch diameter pipe at normal depths for residential use. The total cost (Part <br />A of Appendix A) minus trunk costs (larger pipe. deeper) equal the lateral cost. <br /> <br />5 <br />