My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-02-05 P&R
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2003
>
2003-02-05 P&R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2007 1:09:35 PM
Creation date
3/16/2007 1:09:24 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />29 January 2003 <br /> <br />To: Park and Recreation Commission <br /> <br />From: Paul Palzer, Public Works Director/Building Official <br /> <br />\J<~. <br />~~ <br /> <br />Re: Maintenance recommendations for 2003 <br /> <br />Dear Chair and Commission Members: <br /> <br />The Commission requested that I put together a list of park repairs for the fiscal year <br />2003. In reviewing the approved budget the only monies available for repair or <br />replacement of park items is the $200.00 and $500.00 under building repair and <br />landscaping materials. Additional monies were appropriated under professional services <br />and rentals totaling $20,000.00. Items missing from line item budget figures are lawn <br />mowing, fertilizer and weed control and satellite rental, the total of which cost about <br />$25,000.00 in 2002. This leaves the current fund about $5,000.00 short. Cuts will have <br />to be made in the area of fertilizing and satellite rentals. 1 strongly object to cutting back <br />on any turf maintenance item in LaMotte Park, since the City has spent over $300,000.00 <br />in the last five years to improve the field quality. Your suggestions on possible cuts or <br />funding options to balance the budget would be helpful. <br /> <br />The maintenance items which should be completed in 2003 include re-roofing the park <br />building at LaMotte Park. The City did receive $500.00 from insurance for this purpose <br />as a result of the hail damage and I have received quotes in the neighborhood of <br />$4,500.00 to perform the work. Other items include replacement of the rotted timbers at <br />McBride Park, replenishing the fibar under the playground areas at Acorn, Eagle and <br />Royal Meadow parks. Several other items that were originally planned was to paint the <br />inside of the warming house, thin the pine trees at Eagle park and add a sound/P .A. <br />system at the warming house to aid the rink attendants. <br /> <br />The Commission also expressed an interest in paving the parking lot at LaMotte Park as a <br />key improvement for 2003. If funds for these projects are not allocated, these necessary <br />repairs for children's safety and to safe guarding the integrity of the buildings will be put <br />off until the 2004 budget cycle is approved. Any ideas will be greatly appreciated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.