Laserfiche WebLink
<br />** <br /> <br />** <br /> <br />** <br /> <br />(;4r) <br /> <br />ARTICLE 5. Contract Price <br /> <br />5.1. City shall pay Contractor for completion of the work in accordance with the Contract <br />Documents an amount in current funds as follows: <br /> <br />ARTICLE 6. Payment <br /> <br />6.1. Final Payment <br />6.1.1. Upon Final Completion and acceptance of the work, City shall pay the remainder <br />of the Contract Price as recommended by Engineer. <br /> <br />ARTICLE 7. Contractor's Representations <br /> <br />7.1. In order to induce City to enter into this Agreement, Contractor makes the following <br />representations: <br />7.1.1. Contractor has examined and carefully studied the Contract Documents and the <br />other related data identified in the Bidding Documents. <br />7.1.2. Contractor has visited the Project Site and become familiar with and is satisfied <br />as to the general, local, and Project Site conditions that may affect cost, progress, <br />and performance of the work. <br />7.1.3. Contractor is familiar with and is satisfied as to all federal, state, and local Laws <br />and Regulations that may affect cost, progress, and performance of the work. <br />7.1.4. Contractor has obtained and carefully studied (or assumes responsibility for <br />having done so) all subsurface conditions reports, investigations, explorations, <br />tests, studies, and data concerning conditions (surface, subsurface, structural <br />and/or Underground Facilities) at or contiguous to the Project Site which may <br />affect cost, progress, or performance of the work or which relate to any aspect of <br />the means, methods, techniques, sequences, and procedures of construction to be <br />employed by Contractor, including applying the specific means, methods, <br />techniques, sequences, and procedures of construction or demolition, if any, <br />expressly required by the Contract Documents to be employed by Contractor, and <br />safety precautions and programs incident thereto. <br />7.1.5. Contractor does not consider that any further examinations, investigations, <br />explorations, tests, studies, or data are necessary for the performance of the work <br />at the Contract Price, within the Contract Deadlines, and in accordance with the <br />other terms and conditions of the Contract Documents. <br />7.1.6. Contractor is aware of the general nature of work to be performed by City and <br />others (if any) at the Project Site that relates to the work as indicated in the <br />Contract Documents. <br />7.1. 7. Contractor has correlated the information known to Contractor, information and <br />observations obtained from visits to the Project Site, reports and drawings <br />identified in the Contract Documents, and all additional examinations, <br />investigations, explorations, tests, studies, and data with the Contract Documents. <br /> <br />** RE: 7.1.2. 4. 5: <br />Contractor does not have a specific site analysis AGREEMENT BETWEEN <br />All si tework is based on "typical" soil and CITY OF CENTERVILLE AND <br />dig3~n~ condi ~ions. If "extreme and unusual" site Flanagan Sales, Inc., <br />con lt10ns eXlst, contractor may need assistance from PAGENO.2of4 <br />owner or may need to change the scope of th1"S <br />contract. <br />