My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-07-07 P&R
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2004
>
2004-07-07 P&R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2007 9:41:29 AM
Creation date
4/2/2007 9:40:46 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Parks & Recreation Committee <br />Meeting Minutes 06-02-04 <br /> <br />Chairperson Peterson said by the start of the program on June 14,2004 the skate park pad should <br />be completed and the fields and warming house will be able to be used. Construction vehicles <br />may be parked in the parking lot, but that should not affect the program. Ms. Jen Smith was also <br />concerned because of the small amount of children registered at this point. It was decided by the <br />YMCA Staff that they would leave the registration open longer, accept walk-ins and proceed <br />with the program. There was only one session held in 2003 and it was later in the summer, but <br />was very well attended. The committee discussed what was different this year to have such a <br />poor turnout. It is being promoted on the web site, cable, at local businesses and with the schools, <br />the only difference this year was it did not go out in the utility billing and it is being held in June <br />opposed to August. Ms. Stephan will contact Ms. Jen Smith to see if the YMCA wants to <br />promote the second session by sending out a flier in the July 15th utility billing. <br /> <br />Senior Pro2rams <br /> <br />Ms. Stephan provided the committee with multiple options to get a survey to the residents, such <br />as including a one page survey with the utility billing to go out July 15. There is a possibility <br />there may not be enough room with Fete des Lacs information going out at the same time, but it <br />could be workable. Include information and a scaled down survey in the newsletter, also sent out <br />with utility billing, it would require less space in the mailing, but would it be part of the <br />newsletter. Send individual mailings to target groups such as Eagle Pass Associations and <br />Chauncey Barett, we do have individual addresses for the units at Chauncey Barett. Send a <br />survey to all residents or target groups around specific areas or specific parks for instance like <br />what was done for Tracie McBride Memorial Park. Committee Member Seeley will continue to <br />work on a draft and present it to the committee at the next scheduled meeting. <br /> <br />Ea21e Scout ProiectCs) <br /> <br />Council Member Capra asked the committee to consider if there are any projects that could be <br />completed by Eagle Scouts. The committee discussed a few options such as a gazebo, perhaps at <br />Peltier Preserve or the Centerville Lake property, depending on how much time the Eagle Scouts <br />have and when the projects need to be done. Bird and bat houses were suggested, as well as the <br />stenciling program. Vice-Chairperson LeBlanc agreed to call Council Member Capra and try and <br />coordinate a project(s) for the Eagle Scouts. <br /> <br />Park Monument Si2DS / Flower Beds <br /> <br />All the monument signs / flower beds have been planted except for Royal Meadows and Laurie <br />LaMotte Memorial Park. Ms. Stephan is going to work with a resident to do Royal Meadows <br />and Laurie LaMotte Memorial Park is not going to be done at this time because of the <br />construction. <br /> <br />Rice Creek Watershed District Drain Stencilin2 Pro2ram <br /> <br />Ms. Dawn Dubats, coordinator for the Rice Creek Watershed Stenciling Program met with <br />Chairperson Peterson, Committee Member Seeley, Vice-Chairperson LeBlanc & Ms. Stephan at <br />City Hall on Thursday, May 13,2004 to train those present in using the stenciling equipment and <br />answer questions. <br /> <br />30f6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.