My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-02-02 P&R Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2005
>
2005-02-02 P&R Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2007 1:02:32 PM
Creation date
4/3/2007 1:01:51 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />\0, <br />. <br /> <br />Ms. Kim Stephan, Park and Recreation Liaison <br />City of Centerville <br /> <br />January 12, 2005 <br />Page 5 <br /> <br />SUMMARY <br /> <br />Based on analysis of the trail alignment criteria, it is anticipated there would be some <br />additional costs associated with soil corrections. needed for constructing several sections <br />of the proposed trail alignment. The proposed trail alignment along County Road 54 <br />should be reviewed in more detail with Anoka County to ensure its compatibility within <br />the existing right-of-way and with any future roadway improvements. Further <br />consideration should also be given to continuing the alignment of the trail corridor north <br />of Clearwater Creek along County Road 54 and connecting to the proposed trail on the <br />south side of County Road 14. This alignment will eliminate a ditch crossing behind the <br />industrial development and minimize the potential for additional soil corrections and trail <br />right-of-way acquisition on the east side of County Road 54. <br /> <br />Finally, as identified in the trail alignment criteria and cost estimate sections of this <br />document, several items should be addressed in more detail to affirm the feasibility and <br />cost of these trails. These items include the following: <br /> <br />· Topographic survey <br /> <br />· Wetland delineation <br /> <br />· Geotechnical analysis <br /> <br />The availability of these items will allow for a more thorough and accurate analysis of the <br />feasibility and cOst of this trail corridor. <br /> <br />H:'Projects\4983\LA\109th Ave trail'DOC\C/earwater Trail Extension study. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.