My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-10-2 P & R Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2002
>
2002-10-2 P & R Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2007 12:04:36 PM
Creation date
4/27/2007 12:04:22 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2 Oct 2002 <br /> <br />TO: Park & Recreation Committee <br />City of Centerville <br />1880 Main 8t <br />Centerville, MN 55038 <br /> <br />Commissioners: <br /> <br />. <br /> <br />The Lions of Centerville have contacted Bruggmann Contracting to <br />look at the possibility of remodeling and/or adding on to the present <br />warming / concession / maintenance / bathroom building located at Laurie <br />LaMotte Park in Centerville. One of the items that the Bruggmann <br />Contracting Company was looking for was the structural drawing for the <br />present building. I have contacted Paul Palzer, City of Centerville Public <br />Works Director; he has stated that he has no drawings. I then attempted to <br />contact the Cities previous engineering firm Maier Stewart & Associates <br />which were intwn bought out by H.R. Green Company, but they stated that <br />anything that pertained to the City of Centerville was turned over to <br />Bonestroo Roesne AnderIink & Associates. I contacted Tom Peterson, the <br />present City Engineer, but he said that the only things that his company had <br />received from H. R. Green were utilities and street drawings and information <br />pertaining to the aforementioned. <br />The Lions of Centerville will continue to pursue for information on <br />the building other wise we will ask Bruggmann to go ahead with some ideas <br />concepts for the present building. I have located the locations for the <br />electric / gas / water / sewer services surrounding the building along with the <br />storm water drainage locations. It looks like an addition could be added <br />onto the East end of the present building to make it more useable in the <br />future. <br />The Lions of Centerville wanted to insure that the Park & Recreation <br />Committee was informed of what steps the Lion Club is pursuing and <br />looking also for your input concerning any future plans for the building. <br />Thank you for listening to this presentation. <br /> <br />Lion John Thill <br />Lion Tom Wilharber <br />Building Committee <br />
The URL can be used to link to this page
Your browser does not support the video tag.