Laserfiche WebLink
<br />~cf-R <br /> <br />November 19, 2002 <br /> <br />Hi Kim. Please forward this to mayor, mayor-elect, council, council-elect, all <br />committees and any others interested. We need to refer back to the Design Team when <br />considering vacation of Goiffon Road or any other roads in the Downtown area. <br />1. With CSAH 14 being considered for improvement in 2006, we need to see <br />those plans those plan entail and what that results are. <br />We need to plan for the improvements of City street in the Downtown area <br />jointly with the CSAH 14 project. <br />We need to consider through traffic as well as local traffic flows. <br />Zero lot line setbacks maintain an existing Downtown look and also provides <br />for future renovations of existing structures and new buildings to create and <br />further enhance that vision over the long tenn. <br /> <br />2. <br /> <br />" <br />..:l. <br /> <br />4. <br /> <br />Imagine new streets, curbs, sidewalks, street lights, trail connections, traffic signals, and <br />the not so beautiful items, but needed City water, new sewer, and St0l111 sewer. Maybe <br />we need to get in touch with the Design Team as we go through this process with the <br />County. I have seen Downtowns with County and even State roads through them and <br />zero lots lines for all types of buildings and uses. <br /> <br />I can be reached at 612-720-4056 or tim(c/)timrehbine.com. Thank you. <br /> <br />Sincerely, <br /> <br />Tim Rehbine <br />