My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-02-14 Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2007
>
2007-02-14 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2007 10:56:09 AM
Creation date
5/4/2007 10:55:28 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />not swept within the specified time allowed or in the case of an emergency the city <br />may sweep the street and the responsible party will reimburse the city for all <br />associated costs. <br /> <br />H. Tree trimming and pruning areas will be swept within five days of the operation. <br /> <br />I. Citizen requests for sweeping will be evaluated and the Public Works Director will <br />determine the priority. <br /> <br />3. How will streets be swept? <br /> <br />Sweeping is a slow process with average gutter line speeds for the first sweeping in spring <br />that can be as slow as 2 to 3 miles per hour. The city will sweep through contract services. <br />Normally centerlines are swept after gutter lines are cleaned. Equipment may include <br />mechanical, vacuum, or regenerative air sweepers. <br /> <br />4. Priorities <br /> <br />The City has identified as a priority the sweeping of all streets in the spring to remove <br />winter sand accumulation. Since the City has determined that it cannot justify ownership of <br />pick-up sweeping equipment, the sweeping will generally be by contract service or where <br />appropriate by manual methods. Sweeping will be contracted as soon as possible, after the <br />risk of snow has passed. <br /> <br />Alternate: <br />The city has classified city streets based on the street function, traffic volume, impact on <br />water quality and the environment, and the importance to the welfare of the Community. <br />Accordingly, sweeping routes will be designed to provide the maximum possible benefit to <br />higher volume and water quality sensitive areas. See attached maps or routes. <br /> <br />5. Weather conditions <br /> <br />Sweeping operations will be conducted when weather conditions permit. Factors that may <br />delay sweeping operations include: temperatures, wind, rain, snow, and frozen gutter lines. <br /> <br />6. Work schedule <br /> <br />Sweeping operations are performed in conjunction with and can be impacted by other <br />maintenance operations. Sweeping operations will normally be conducted Monday - <br />Friday, from 7:00 a.m. to 3:30 p.m. Extended workdays and shift changes may be utilized <br />for spring cleanup or emergency sweeping to provide maximum efficiency. For safety <br /> <br />C:\Documents and SettingslTBenderCENTERVILLEMNILocal Settin~Temporary Internet FileslOLKE71Street Sweeping Policy <br />2006v2I.doc <br /> <br />Z3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.