Laserfiche WebLink
<br />DRAFT <br /> <br />2/8/2007 <br /> <br />EXHIBIT D <br /> <br />ELECTRICAL FEES <br /> <br />IndividuaVseparate inspection (installation, replacement, alteration or repair)......~ $35.00 <br /> <br />Services, generators, feeders to separate structures and other power supply resources: <br /> <br />1. 0 ampere to and including 200 ampere capacity ..........................................................$35.00 <br />2. Each additional 100 amps or fraction thereof .................................................. an add'I-$&OO $10.00 <br />3. For services and circuits operating at over 250 volts .................... (Scheduled fee doubles) <br /> <br />Circuits, feeders, feeder taps, or sets of transformer secondary conductors: <br /> <br />1. 0 ampere to and including 30 ampere capacity ..............................................................$8.00 <br />2. 31 amps to 100 amps..................................................................................................$10.00 ea. <br />3. Each additional 100 amps or fraction of.......................................................... an add'l $5.00 <br /> <br />One-Family dwelling and each dwelling unit of a two-family dweIling.................................................$150.00 <br />Up to and including 200 amps service (includes not more than three inspections) <br /> <br />Multifamily dwellings, the first 20 URits each unit at ..............................................................................$6G,OO $80.00 <br /> <br />RemainiBg UBits...................................................................... ................................................. $50.00/UBit <br /> <br />Electrical supply for each manufactured home park lot...........................................................................~ $40.00 <br /> <br />Recreational vehicle site, electrical supply equipment ............................................................................$10.00 ea. <br /> <br />Street, parking lot or outdoor area lighting standards................................................................................$5.00 <br /> <br />Transformers for light, heat and power:.......... ...................... ............... ......................................... ..... .......$8.00/URit <br /> <br />Each K\' A.................................. .................................................. .............................................. .$. ~o ea. <br />~1HIl fee fer aay 1faBsfarmer... ...................... ...................... ............... ..............................$80.00 <br />1. Up to and including 10 kilo-volt amps.................................................................................$20.00 ea. <br /> <br />2. Over 10 kilo-volt amps................. .............................................. .......................... ............... $40.00 ea. <br /> <br />Transformers and electronic power supplies for electric signs and outline lighting........................ $7.00 lot 500 VA $7.50 <br /> <br />............................................................. ....................... .................................... $.70 ea. ."'.IId'!. 100 VA <br /> <br />Alarm. communication, remote control and signaling circuits or systems and circuits of less <br />than 50 volts ......................................................................................................... $10.00 fer 10 apeoiRgs $1.00 ea. <br /> <br />. . ...... .... ... . . ... ..... ..... ...................................................... ............................. $5.00 ea. .^~dd'l 10 apeniBgs <br /> <br />Minimum fee............................................................................................. .............................. ~ $35.00 <br /> <br />Swimming pool bonding inspection (each separate inspection)............................................................... $25.00 <br />(Bonding conductors and connections require an inspection before being concealed) <br /> <br />Retrofit modifications to existing lighting fixtures................................................... ................................. ..$.40/fixture <br /> <br />Electrical work commenced without filing the required penuit ............................................................... $75.00 <br />or double the calculated <br />fee, whichever is greater <br /> <br />Re-Inspection fee (when inspection is necessary to determine whether the unsafe conditions have been corrected a fee <br />may be assessed in writing by the inspector) of ......................................................................................~ $35.00 <br /> <br />When inspections scheduled by the installer are pre-empted, obstructed, prevented or otherwise not able to be completed <br />as scheduled due to circumstances beyond the control of the inspector, a supplemental inspection fee may be assessed in <br /> <br />writing by the inspector of .......................................................... .... .......................................................~ $35.00 <br /> <br />Page 10 of 14 <br /> <br />J1) <br />