Laserfiche WebLink
<br />Item Units Qty EE Unit Price EE Total Price I <br />TOTAL BASE BID $128,040.00 <br />TOTAL ALTERNATE NO. 1- TRANSPLANT $5,000.00 <br />LILACS <br />TOTAL ALTERNATE NO.2 - ADDITIONAL SITE $9,900.00 <br />FURNISHINGS <br />TOTAL ALTERNATE NO.3 - SHORELAND $12,000.00 <br />STABILlZATlONlRENOVATlON <br />TOTAL CONSTRUCTION COSTS WITH ALL $154,940.00 <br />ALTERNATES <br />CONTINGENCY (10%) $15,494.00 <br />PAVILION $24,000.00 <br />SUBTOTAL CONSTRUCTION $194,434.00 <br />ENGINEERING, PERMITS, ADMIN., ETC (30%) $ 58,330.20 <br />TOTAL PROJECT COSTS $252,764.20 <br /> <br />/~tJ/ ""j}1~ - ~/'~.J t 7' <br /> <br />000616071550BIDFORM.xIs <br /> <br />00410-1 <br /> <br />BID FORM <br /> <br />3gk <br />