My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-06-13 CC
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2007
>
2007-06-13 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2009 8:30:59 AM
Creation date
6/7/2007 4:46:08 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2335 Highway 36 W <br />51 Paul. MN 55113 <br /> <br />Tpl 651.636-4600 <br />Fax 651-636-1311 <br /> <br />www.bom!suoo.tom <br /> <br />June 5, 2007 <br /> <br />Dallas Larson <br />City of Centerville <br />1880 Main Street <br />Centerville, MN 55038 <br /> <br />.. Bonestroo <br /> <br />Re: Hidden Spring Park - Possible Cost/Scope Reductions <br />City of Centerville <br />Bonestroo File No.: 000616..Q7155.0 <br /> <br />Dear Dallas: <br /> <br />The Hidden Spring Park project was awarded to Veit Construction Co. based on their base bid, plus <br />Alternate 3 (Shoreline Restoration). The total contract amount is $218,281. We understand that the City <br />Council may wish to reduce this expenditure by redudng the scope of the base bid. <br /> <br />We have reviewed the project which was bid to find items which could be eliminated or scaled back to cut <br />costs. A list of those items (along with estimated savings) in order of our preference follows: <br /> <br />1. Electrical work (outlet and overhead lights- in Pavilion) <br />2. Tree trimming, dearing/grubbing (could be done by public works) <br />3. Rain Garden Plantings and Swale Plantings (reduce but not eliminate) <br />4. limestone Outcrops (in Rain Garden and along swale) <br />5. Drinking Fountain <br />6. Trash/Recycling Bins <br />7. Grills <br /> <br />S10,000 <br />S 13,000 <br />512,000 <br />$7,500 <br />$5,000 <br />$1,500 <br />$1,000 <br /> <br />Since all of these items were part of the base bid, we would need to negotiate a change order to eliminate <br />any of them. The prices shown are only an estimate of what could be saved by removing them from the <br />project. <br /> <br />Please call with any questions. <br /> <br />Sincerely, <br /> <br />BONESTROO <br /> <br />~~ <br /> <br />Mark Statz, PE <br />City Engineer <br />651.604.4709 <br /> <br />{opr. PaulPa~er <br /> <br />St. Paul <br />SL Cloud <br /> <br />Rothestefi <br />Milwaukee / :2 <br />Chicago ~ <br /> <br />C,nln.:::rs >. <br />! /\r(-'h:l:ClS <br />I Planoer\ <br />
The URL can be used to link to this page
Your browser does not support the video tag.