Laserfiche WebLink
<br /> <br />CITY OF CENTERVll..LE <br /> <br />NlONTHL Y ENGINEER'S REPORT <br />For June 13,2007 City Council Meeting <br /> <br />Italics = New information. <br />Normal = No change from last report. <br /> <br />1. Pheasant Manh 3rd Addition (000616-03134-0). A walk-thru inspection of the project site <br />will be conducted within a couple of weeks before the wear course is scheduled The walk-thru <br />will be completed with the Developer, Public Works 8taft and Bonestroo. James R. Hill has <br />submitted the Record Plan Drawings and will be reviewed by the Public Works Staff and <br />Bonestroo. <br /> <br />2. Bunten Crossing 3rd Addition (000616-05141-0). The Record Plans were completed by <br />Bonestroo and delivered to the Public Works Staff The Developer is working with the builder <br />to restore some eroded areas on the project site. They are also working with a resident in <br />completing the restoration of their yard A walk-thru inspection of the project site will be <br />conducted within a couple of weeks before the wear course is scheduled <br /> <br />3. 21st AvenuelBackage Road (000616-05143-0). The additional 21-inch pipe required by the <br />County has been installed. Road construction has continued All underground utilities are now <br />installed and curb & gutter is scheduled for early next week Contractor continues to excavate <br />poor materials that lie underneath Parcel D. <br /> <br />4. 2006 Storm. Water Analysis (000616-06146-0). On hold until the 2009 Street Project is better <br />defined. <br /> <br />5. Old Mill Road Improvements (000616-06147-0). Plans and specs are being completed. The <br />bid date is set for June 12th. <br /> <br />6. Fairview Street Improvements (000616-06148-0). The contract has been awarded to <br />Gustafson Excavating and a preconstruction conference was held Construction has just <br />begun. <br /> <br />7. Block 7 Redevelopment Grading and Utility Improvements (000616-06152-0). All <br />underground installation is completed. Contractor has started their punch list work. <br />Contractor still needs to complete the mandrel test and remove the silt fence they installed <br /> <br />8. Centerville Townoffice Park 2nd Addition (000616-06152-0). Construction is underway. <br /> <br />9. Rgn7.f1l's Addition (000616-06154-0). On hold until the Old Mill Road improvements are <br />approved. <br /> <br />10. ffidden Spring Park (000616-07155-0). The project has been awarded to Veit Construction. <br />A preconstruction conference has been scheduled for June 15th. <br /> <br />11. Downtown Overhead Power Relocation (000616-07156-0). Easements and right-of-way on <br />Clearwater Street have been staked. Tree work on Clearwater and Chaucey Barret is done. <br />