My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-06-27 CC
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2007
>
2007-06-27 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2007 4:20:06 PM
Creation date
6/22/2007 4:17:39 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page lof2 <br /> <br />Statz, Mark R <br /> <br />From: Dallas Larson [dlarson@centervillemn.com] <br />Sent: Monday, March 12,20071 :48 PM <br />To: Statz, Mark R <br />Subject: RE: park shelter <br /> <br />Mark, <br /> <br />The two suppliers that provided quotes turned them out in a few minutes. Ideally we would want to have quotes for Wednesday. <br />That is tight, I know, but the long lead times to get the delivery are a significant issue. Delaying for even two weeks may cause <br />problems. <br /> <br />tj)a1fas Larson, .9Ltfministrator <br />City of Centerville <br />651-429-3232 <br /> <br />-Original Messag~- <br />From: Statz, Mark R [maJlto:Mark.Statz@bonestroo.com] <br />Sent: Monday, March 12, 200712:56 PM <br />To: dlarson@centervlllemn.com <br />SUbject: RE: park shelter <br /> <br />Dallas, <br /> <br />I read through the quotes and the correspondence between you and the parks commission. This is the way I would <br />approach it: <br /> <br />I would write a quick letter to send with the quote request stating that the following must be included in the quote: <br />. All necessary engineering including engineering of the structure and foundation. <br />. Furnish (including delivery and unpacking) and install the structure, foundation and any needed base material <br />. Rough finish grading of the disturbed area. <br /> <br />Not included would be turf restoration and finish grading. <br /> <br />We could manage this process and write the letter/spec in a few hours. I would guess, it would be $500 by the time we <br />were done evaluating the bids and recommending one of the quotes. <br /> <br />Mark <br /> <br />From: Dallas Larson [mallto:dlarson@centervlllemn.com] <br />Sent: Monday, March 12,200712:38 PM <br />To: Statz, Mark R <br />SUbject: park shelter <br /> <br />Mark, <br /> <br />What would you charge to manage the quote and construction of a prefab park shelter for each of two parks? Obviously a <br />minimal spec would be needed to get quotes. The Park Committee received quotes from Flanagan Sales and from Midwest <br />Playscapes, but they are not apples and apples. They also quoted them together which may push the cost over $50,000. If <br />they are kept a distinctly separate park projects, we should be okay with quotes. The Committee is looking at a 24 foot <br />square pavilion with a two step roof or cupola. Both of the companies will provide "MInnesota Stamped" engineered <br />drawings. <br /> <br />6/14/2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.