Laserfiche WebLink
<br />~~ -~-- -------- ~--------~-- -- - <br /> Contract Unit Current Quantity Amount <br />No. Item Unit Quantity Price Quantity to Date to Date <br /> PART 1 - SITE GRADING: <br />1 MOBILIZATION lS 1 18000.00 0.75 0.75 $13,500.00 <br />2 TRAFFIC CONTROl LS 1 550.00 0.75 0.75 $412.50 <br />3 TEMPORARY ROCK CONSTRUCTION ENTRANCE TN 35 25.00 $0.00 <br />4 REMOVE CONCRETE CURB AND GUTTER lF 100 3.50 71 71 $248.50 <br />5 REMOVE STORM SEWER PIPE lF 28 23.00 28 28 $644.00 <br />6 REMOVE BITUMINOUS/GRAVEl DRIVEWAY & TRAil SY 500 1.60 $0.00 <br />7 SILT FENCE, MACHINE SLICED lF 620 1.65 230 230 $379.50 <br />8 PROTECTIVE FENCING lF 1350 1.95 400 400 $780.00 <br />9 EROSION CONTROl BlANKETS, CATEGORY 3 SY 660 1.75 $0.00 <br />10 CLEAR AND GRUB TREE 10 1100.00 10 10 $11.000.00 <br />11 TREE PRUNING / TRIMMING EA 4 890.00 4 4 $3.560.00 <br />-12 COMMON EXCAVATION (EV) CY 500 lOO 110 110 $330.00 <br />13 SUBGRADE EXCAVATION (EV) CY 100 6.00 $0.00 <br />14 GRANULAR BORROW (CV) CY 100 13.00 $0.00 <br />15 SUBGRADE PREPARATION SY 700 1.50 $0.00 <br />16 STRIP. 510tKPllE..RESPREAD EXISTING TOPSOil lS 1. 7700.00 0.85 0.85 $6,545.013 <br />17 TOPSOIL BORROW (lV) CY 200 25.00 $0.00 <br />18 FURNISH & INSTAll RAIN GARDEN SOil MIX (CV) CY 80 70.00 60 60 $4.200.00 <br /> TOTAL PART 1 - SITE GRADING: $41.599.50 <br /> PART 2 - WATER MAIN: <br />19 1" CURB STOP AND BOX EA 1 108.00 1 1 $108.00 <br />20 3/4. CURB STOP AND BOX EA 2 92.00 2 2 $184.00 <br />21 CONNECT TO EXISTING WATER SERVICE EA 1 325.00 1 1 $325.00 <br />22 CONNECT TO EXISTING 1" STEEL ARTESIAN WElL PIPE EA 1 650.00 1 1 $650.00 <br />23 3/4" TYPE "K" COPPER WATER SERVICE lF 100 30.00 75 75 $2,250.00 <br /> TOTAL PART 2 - WATER MAIN: $3,517.00 <br /> PART 3 - STORM SEWER: <br />24 15" HDPE STORM SEWER lF 48 25.00 43 43 $1.075.00 <br />25 10" HDPE STORM SEWER lF 40 21.00 36 36 $756.00 <br />26 12. HDPE OUTflOW WITH BEEHIVE lF 20 55.00 30 30 $1.650.00 <br />27 15" HDPE FLARED END SECTION EA 1 315.00 1 1 $315.00 <br />28 12. HDPE FLARED END SECTION EA 1 310.00 1 1 $310.00 <br />29 10" HDPE FLARED END SECTION EA 4 310.00 $0.00 <br />30 CONNECT TO EXISTING CATCH BASIN EA 1 650.00 1 1 $650.00 <br />31 ORNAMENTAL SLAB LIMESTONE OUTFLOW STRUCTURE EA 2 2780.00 2 2 $5.560.00 <br /> TOTAL PART 3 - STORM SEWER: $10.316.00 <br /> PART 4 - TRAILS AND EQUIPMENT PAI?S: <br />32 GEOTEXTllE FABRIC. TYPE V SY 700 1.50 654 654 $981.00 <br />33 AGGREGATE B~E. CLAS~ 5, 100% CRUSHED LIME. ROCK - TRAIL <br /> AND PADS TN 266 30.00 200 200 $6.000.00 <br />34 SURMOUNTABLE CONCRETE CURB AND GUTTER lF 100 22.00 $0.00 <br />35 4. CONCRETE SIDEWALK SF 200 5.00 $0.00 <br />36 TRUNCATED DOME PANEL SF 24 20.00 $0.00 <br />37 ZEBRA CROSSWALK - EPOXY SF 126 10.00 $0.00 <br /> TOTAL PART 4 - TRAilS AND EQUIPMENT PADS: $6.981.00 <br /> PART 5- SITE FURNISHINGS: <br />38 BENCHES - DuMor 88-60PL-S-l EA 3 1050.00 $0.00 <br />39 GLIDER BENCH - DuMor 30-6'-5-1 EA 1 1840.00 $0.00 <br />40 LITTER / RECYCLING RECEPTACLES - 41-32PL-2-1 EA 2 840.00 $0.00 <br />41 GRilLS - DuMor 21-00-5.1 EA 2 590.00 $0.00 <br />42 BIKE RACK- DuMor 130-20-5-1 EA 1 640.00 $0.00 <br />43 DRINIKING FOUNTAIN - MOST DEPENDABLE MODEL 440 DB EA 1 3700.00 $0.00 <br /> TOTAL PART 5 - SITE FURNISHINGS: $0.00 <br /> PART 6 - RAIN GARDEN AND SWALES: <br />44 RAIN GARDEN SWALE WITH WASHED RIVER ROCK IF 77 36.50 62 62 $2.263.00 /~ <br />S1S07155REQ1 xis <br />