Laserfiche WebLink
<br />-~-- --~-- ~------------,..,-~----.----~-~~---' <br /> <br />No. Item <br />46 SUBGRADE PREPARATION - TURN LANE <br />47 AGGREGATE BASE. CLASS 5 <br />48 AGGREGATE SHOULDERING. 100% CRUSHED LIMESTONE <br />49 SElECT GRANULAR BORROW (CV) <br />50 TYPE LV 3 NON WEARING COURSE MIXTURE (B) <br />51 TYPE LV 1 WEARING COURSE MIXTURE (B) <br />52 BITUMINOUS MATERIAL FOR TACK COAT <br />53 SIGN PANelS. TYPE C. HIGH INTENSITY <br />54 4" SOLID LINE. WHITE EPOXY <br />55 PAVEMENT MESSAGE. RIGHT TURN ARROW - EPOXY <br />TOTAL PART 5 - CSAH 54 RIGHT TURN LANE: <br /> <br />Contract <br /> <br />Unit Quantity <br />SY 900 <br />TN 350 <br />TN 60 <br />CY 550 <br />TN 260 <br />TN 90 <br />GAL 130 <br />SF 12.5 <br />LF 850 <br />EA 2 <br /> <br />TOTAL PART 1 - SirE GRADING: <br />TOTAL PART 2 - WATER MAIN: <br />TOTAL PA~T 3 .- STo.RM SEWER: <br />TOTAL PART 4 -STREETS: <br />TOTAL PART 5 - CSAH 54 RIGHT TURN LANE: <br />TOTAL WORK COMPLETED TO DATE <br /> <br />616116148REC1 !lis <br /> <br />,. <br /> <br />Unit CUrrent Quantity <br />Price Quantity to Da~e <br />0.80 824 824 <br />16.00 2,70 270 <br />18.00 <br />7.50 350 350 <br />54.10 230 230 <br />54.95 <br />2.30 <br />42.00 <br />0.30 <br />90.00 <br /> <br />Amount <br />to Date <br />$659.20 <br />$4.320.00 <br />$0.00 <br />$2.625.00 <br />$12.443.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$24.319.70 <br /> <br />$18.335.50 <br />$750.00 <br />$8,732.00 <br />$105.531.90 <br />$24.319.70 <br />$157.669.10 <br /> <br />~ <br />