Laserfiche WebLink
<br />City ofC~nlerviJ~ <br />Cel/lervi/k DOWIIlOWn /l2deWlnpmflnl Prc1ecl <br /> <br />Dec.!mber 19. 2006 <br />PGge 1 <br /> <br />Idenlifying the areas or concern will be accomplished through discussion with local government staff and <br />regulatory agencies, and. if appropriate.. other affected parties. Soliciting input and addressing <br />environmental concerns from all parties early on in the EA W process is invaluable in minimizing project <br />delays. Should previously unrecognized environmental issues become evident during this process. (he <br />scope or the environmental analysis (see Task 5) can be modified to address the concerns. <br />. <br /> <br />Supporting studies that appear at this time to be needed include analyses of traffic impacts. air quality and <br />noise impacts. and wetland impacts (see Tasks 1-4 below). A stonnwater analysis wilJ also be needed but <br />will be completed under a separate scope of work. It is assumed that the results of tlle stonnwatcr <br />analysis will be available in time for use in preparation of the EA W. For the purposes of this proposal, it <br />is asswned that other studies or field surveys (such as cultural resources/archaeological surveys. etc.) will <br />not be necessary to complete the EA W, or that they will be completed under a separate scope of work. If <br />additional studies or field surveys become warranted, we will contact you immediately and discuss bow <br />you wish to proceed. <br /> <br />Task 2: Traffic Analysis <br /> <br />The traffic study included in the CSAH 14 study docs not appear to include sufficient future growth to <br />cover the proposed land uses in the City's redevelopment area. Therefore. a rraffic study relative <br />specifically to the proposed redevelopment project will be completed in order to detennine the traffIC <br />impacts that could be expected to result from the project. We propose the following activities to complete <br />the traffic portion of this proposed developmenl's EA W: <br /> <br />· Collect necessary background infonnation on the project, including traffic counts at six (6) <br />intersections during the a.m. and p.Ol. peak hours. <br />· Prepare peak hour traffic tOTecasts for the study intersections for the years 2010 and 2030. <br />Prepare average daily traffic forecasts on CSAH 14 and CSAH 21 for the years 2010 and <br />2030. <br />. Analyze the traffic impacts oftbe proposed development for the years 20 10 and 2030. The <br />analyses would include the peak hour operations at the study intersections and the daily <br />volumes on the study roadways. <br />. Prepare a draft report discussing our process, results, and recommendations for the traffic <br />operations associated with the proposed development. <br /> <br />Our collection of background data includes confinning that less intense development was used in the <br />CSAH 14 EA W to ensure this traffic study is needed. Three meetings with the City. developers, andlor <br />the County are also expected to discuss our processes and results, including a kick-off meeting to discuss <br />initial assumptions and study direction. <br /> <br />Task J: Wetland DeterminationJDelineadoD <br /> <br />Since we are outside of the growing season (April- October), a wetland detennination will be performed <br />to identifY wetlands located within the project ara. We anticipate investigating at least three areas based <br />on aerial photo, National Wetlands Inventory, and hydric soils map review. We wiD provide preliminary <br />wetland boundaries based on the freld investigation. <br /> <br />In the spring (during the growing season). a wetland delineation will be performed in accordance with <br />U.S. Army Corps of Engineers standard jurisdictional wetland delineation protocol to identify wetland <br />areas and detennine potential impact or avoidance issues. A wetland delineation report will be prepared <br />and submitted to the Rice Creek Watershed District for approval as the LocaJ Government Unit (LOU) <br />responsible fortbe adminislration of the Wetland Conservation Act (WCA). <br /> <br />3J <br />