Laserfiche WebLink
<br />------- ------~--~---- ~- --- -- -- ---- - - ---- - --- -- ----- --- ~- ---------,-- -- -- <br /> <br />MEMO <br /> <br />Date: July 12,2007 <br /> <br />To: Dallas Larson, City Administrator <br /> <br />From: Paul Palzer, Public Works Director/Building Official <br /> <br />Re: Sidewalk replacement <br />I I I I I I I I I I I I I I I I I I I I I I II I I I I I I I I I I I I I I I I I I IIII I I I I I I I I I I I I I I I I I <br />After completing the sidewalk inspection for the city except for the downtown and Main <br />Street sidewalks, I found 275 cracked panels or 8% of the 3.35 miles of sidewalk in town. <br />Of the 275; 48 are hazardous and need to be replaced. Also 17 street ramps are also in <br />need of replacement. <br /> <br />I invited four contractors to provide quotes for the replacement of cracked sidewalk <br />panels. I have received two quotes for this work. Frontier Concrete & Masonry, Inc. <br />provided a break out of the work as requested and J.S. Krey Construction Co. provided a <br />flat unit cost per panel and did not provide a price on the street ramps. <br /> <br />Item #1 included panels that I deemed "hazardous" and need replacement. Item #2 <br />included the rest of the cracked panels on the properties that have hazardous panels. Item <br />#3 includes 17 street ramp transition panels that should be replaced. <br /> <br />Frontier Concrete & Masonry quoted a price of $258.62 per panel for the first 48 and <br />then $184.21 per panel for the balance of cracked panel on the same properties. J.S. Krey <br />quoted $265.00 per panel for all 163 panels. The reason behind this bid unit is if the <br />Council wants the owner to participate in the costs, we will not be visiting the same <br />properties next year if the other existing cracked panels shift and become "hazardous". <br /> <br />If the Council elected to accept items 1,2 & 3, the total cost with Frontier would be . <br />$45,215. Some of the panels are also part of the driveway for the residents and I can <br />break this farther down per lot ifnecessary. The quote includes saw cutting the joints, <br />removing the existing concrete panel and hauling away. Temporary cones would be set <br />in place until the concrete is poured and dirt and seed would restore any damage to the <br />boulevard area. <br /> <br />My recommendation is for the Council to approve item #1, 2 & 3. If the Council would <br />like to replace all of the cracked panels in town, another 112 would get replaced at a cost <br />of $20,631.00. <br /> <br />~! <br />