My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-22 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2007
>
2007-08-22 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2007 3:37:35 PM
Creation date
8/17/2007 3:36:24 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ---------- <br />"" <br />f . <br /> Contract Unit Current Quantity Amount <br />No. Item Unit Quantity Price Quantity to Date to Date <br /> PART 7 - CSAH 54 RIGHTTURN lANE: <br />100 TRAFFIC CONTROL LS 1 1000.00 1 $1,000.00 <br />101 COMMON EXCAVATION (P) CY 230 15.00 230 $3,450.00 <br />102 SAWING BITUMINOUS LF 500 2.75 $0.00 <br />103 SUBGRADE PREPARATION SY 750 0.75 750 $562.50 <br />104 AGGREGATE BASE, CLASS 5 TN 270 11.50 200 $2,300.00 <br />105 TYPE LV 3 NON WEARING COURSE MIXTURE (B) TN 95 58.00 90 $5,220.00 <br />106 TYPE MV3 NON-WEAR COURSE (C) TN 65 66.00 60 $3,960.00 <br />107 TYPE MV3 WEAR COURSE (C) TN 65 66.00 60 $3,960.00 <br />108 BiTUMINOUS MATERIAL FOR TACK COAT GAL 80 2.60 50 50 $130.00 <br />109 4" SOLID LINE, WHITEEPOXY LF 720 0.50 695 695 $347.50 <br />110 PAVEMENT MESSAGE, RIGHTTURN ARROW - EPOXY EA 1 125.00 2 2 $250.00 <br />111 SEEDING AC 0.2 775.00 $0.00 <br /> TOTAL PART 7 - CSAH 54 RIGHT TURN LANE: $21,180.00 <br /> CHANGE ORDER NO.1 <br />1 CREW TIME HR 3.5 725.00 3.5 $2,537.50 <br />2 8" DIP PLUG EA 1 73.49 1 $73.49 <br />3 CREW TIME HR 7 725.00 7 $5,075.00 <br />4 8" DIP 45 DEGREE BEND EA 4 279.88 4 $1,119.52 <br />5 8" PVC, C900 WATERMAIN LF 10 14.72 10 $147.20 <br />6 1.5" ROCK STABILIZATION TN 15 19.73 15 $295.95 <br />7 CREW TIME HR 0.5 725.00 0.5 $362.50 <br /> TOTAL CHANGE ORDER NO.1: $9,611.16 <br /> CHANGE ORDER NO.2 <br />1 8" DIP WATER MAIN, CLASS 52 LF 35 29.00 35 $1,015.00 <br />2 8" GATE VALVE AND BOX EA 1 950.00 1 $950.00 <br />3 CONNECTTO EXISTING 8" WATER MAIN EA 1 1000.00 1 $1,000.00 <br />4 8" 90 DEGREE BEND EA 1 235.00 1 $235.00 <br />5 8" PLUG EA 1 100.00 1 $100.00 <br />6 8" FITTING RESTRAINT EA 4 48.00 4 $192.00 <br /> TOTAL CHANGE ORDER NO.2: $3,492.00 <br /> C,HANGE ORDER NO.4 <br />1 MOBILIZATION LS 1 3000.00 1 1 $3,000.00 <br />2 21. RCP STORM SEWER LF 432 35.50 432 432 $15,336.00 <br />3 21" RCP FLARED END SECTION EA 1 1500.00 1 1 $1,500.00 <br />4 SALVAGE AND REINSTAll 6" PVC DRAlNTllE LF 200 18.00 200 200 $3,600.00 <br />5 RIP RAP, CLASS III CY 15 100.00 15 15 $1,500.00 <br />6 RESTORE DRAINAGE SWAlE LS 1 2000.00 1 1 $2,000.00 <br /> TOTAL CHANGE ORDER NO.4: $26,936.00 <br /> <br />TOTAL PART 1 . SITE GRADING: <br />TOTAL PART 2 - SANITARY SEWER: <br />TOTAL PART 3 - WATER MAIN: <br />TOTAL PART 4 - SERVICES: <br />TOTAL PART 5 - STORM SEWER: <br />TOTAL PART 6 - STREETS: <br />TOTAL PART 7 - CSAH 54 RIGHT TURN lANE: <br />TOTAL CHANGE ORDER NO.1: <br />TOTAL CHANGE ORDER NO.2: <br />TOTAL CHANGE ORDER NO.4: <br /> <br />$284,625.29 <br />$36,545.30 <br />$120,951.00 <br />$8,696.00 <br />$201,962.00 <br />$344,918.07 <br />$21,180.00 <br />$9,611.16 <br />$3,492.00 <br />$26,936.00 <br /> <br />TOTAL WORK COMPLETED TO DATE <br /> <br />$1,058,916.82 <br /> <br />61605143REQ5.x1s <br /> <br />~ <br /> <br />- - - --------- ------'---------- ------'-~~ ---- <br /> <br />------------- <br />
The URL can be used to link to this page
Your browser does not support the video tag.