My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-22 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2007
>
2007-08-22 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2007 3:37:35 PM
Creation date
8/17/2007 3:36:24 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Lift Station #3 <br /> <br />It has been proposed that CenterviUe's lift station number three (LS #3) be etiminated and a new ~ <br />sanitary fine be run from the lift station to Hft station number four. A survey loop was nm between the two <br />lift stations, confirming this is physically possible. <br /> <br />DISI1NG (ONDITIONS <br /> <br />Currently, LS '3 is operated and malntafned by CenterVille's publIc works staff. The 6ft station was installed <br />In 1981 and the pumps were replaced on the station in 1997 indicating a 10 year life span fOl these pumps. <br />This would lead us to the assumption that the existing pumps are likely nearing the. end of theif useful life. <br /> <br />The staff Is spending approximately one hour of time per weeIc at the lift station for maintenance needs. <br /> <br />PROPOSED IMPIIOVEIIBIfS <br /> <br />flow enterfng LS '3 would be Ie routed in one of two directions. In Option 1, the outgoing pipe woukf run <br />south along the existing storm pond and then east along the south side of the development in the City's <br />existing uttlity easement <br /> <br />A1tematively, the sewer could be relayed from LS #3 to the east. down Center Street This would require re- <br />hooking services along the way but may be sfrghtly shorter and would replace the existing sewer which is <br />about 20 years old. <br /> <br />The estimated project cost of each at these options is presented In Table XX. The proposed routes are <br />shown on Figure xx. <br /> <br /> <br />1.511 <br /> <br />$59,500 <br />$20 000 <br />$10,000 <br />$0 <br />$15.000 <br />$4,500 <br />$109,000 <br /> <br />Pi . MHs, etc. (1600 If <<D35flF) <br />Jackln (under CSAH 54 <br />Connect 10 LS <br />Reconnect ServIces <br />RestotatIon (turf) <br />Restoration (road <br />Total <br /> <br />$56 000 <br />$20,000 <br />$10,000 <br />$5,000 <br />$1,000 <br />$50 000 <br />$142.000 <br /> <br />$ <br />
The URL can be used to link to this page
Your browser does not support the video tag.