Laserfiche WebLink
<br />16 August 2007 <br /> <br />To: Dallas Larson, City Administrator <br /> <br />From: Paul PaIzer, Public Works Director/Building Official f.'" <br /> <br />R.e: ,2007 sidewalk: :repair project <br />II II 1IIII1 II I III II I J II J I IIIIII I III III II II I II I II II I I I I I I II I II I II <br /> <br />I have received quotes from the following venders for the replacement of hazardous and <br />d9111aged sidewalk panels as previously ideJ'ltified. The repJ.acement project includes <br />those items as attached. Homeowners will be responsible for all private facilities within <br />the right of way including irrigation systems, invislole fencing. and plantings within 3 feet <br />of the sidewalk." The contraCtor will replace any damaged sod and the homeowner Will be <br />responsible for the watering~ <br /> <br />I recommend that the Council con1:l'aCt With Andrew Ross Concrete 8nd Masonry for the <br />quoted work of 198 panels and 5 pedestrian ramps and include the balance of the 80+ <br />panels and 12 pedestrian ramps in town for the per tIllit Cost as proposed not to exceed <br />$42,OOO.00~ <br /> <br />The quotes are as follows: <br /> Panels Pedestrian Ramps Site work <br />AD.drew Ross Concrete $128.50 $430.00 Included <br />Jim Gregoire Concrete $211.20 $400.00 Included <br />Frontier Concrete $i48.50 $1,2~0.OO $2,334.50 <br /> <br />3;/ <br />