<br />. ~ N, ,'~ .. " "_~~.~~,yo. .-.......~]) "d)' ...........~ ,,,,,..,:,~,,,, .n. """n.. ,~'tt"'" ' ""U," ,-.,...,,,.,.:.., '~~-l-'''.'I>,,,-,,~,,,,,,,t''.'''''I.'_-'b''..,,,.~, .'.h......~."hT> ,......... ......t<."......,~......,.....~ .,.....,...."..... "-'''''''''''''l.nLl.=n'",(~ .u."'....'\l'.i'{...l"..:."h\~'\;.\....t-l.:~Tonmr><!1o.I..a
<br />. '.
<br />
<br />8-15-07
<br />
<br />Jim Gregoire CODerete
<br />Jim Gregoire
<br />16720 Henna Ave
<br />Hugo MN, 55038
<br />651-755-9646
<br />
<br />~
<br />
<br />Bid for The City of Centerville on sidewalk replacement.
<br />
<br />Jim Gregoire Concrete will replace the sidewalk: in the tfti of CenterYille'in
<br />accordance with their requirements. .
<br />Concrete will be confbrmed to the Mndot spec 2461.
<br />The pedestrian ramps will include trn1lCated dome panels by CoJ4 Spring Granite
<br />Co. 2" minlmuJn thicknesS or Hanover detectable warning paver. The truncated dome
<br />will be cured for II minimlq)'l of 7 days before joint sealer is applied. The joint being 1/4
<br />- 1/2 inch in thickness and sealed with Dow Corning 888 or NS pari:ing st:ruCture se911ltrt.
<br />Truncated dOmes in red. All concrete will be coated in the appropriate curing compound
<br />within 30minutes after fini~hing and II second application perpendiCularly to the first 4-8
<br />hours later. .
<br />Joints will be saw cut and removed as r~ An appropriate sealer will be used
<br />upon the .cities specific request. All panels will be II m;nimum of 4' thick no thicker tba:i1
<br />4 ~ ' and in II broom finish. Caution tape will be used around aJl4 corners of each
<br />individual panel and any driveway street si4es before and after placement of concrete.
<br />Any work that seemS unacceptable will be reviewed between the City of
<br />Centerville and Jim Gi'egoire for replacement upon request. This includes any
<br />replacement" of asphalt. Tnn Gregoire Concrete will take precautions to protect any
<br />placement of concrete but however will not be responsible fur the replacement of any
<br />damages done by vandalism effective 6 hours after paneljob is completed. The requested
<br />installation of backfill, pulverized black dirt and sod will be cared for Within the 72 hours
<br />after the placement of concrete.
<br />
<br />Per unit pricing is as followed:
<br />
<br />Pedestrian Panels: $400.00 per ramp panel
<br />4XSft Panels: $211.20 per panel
<br />
<br />The final cost for the replacement ofsidewa1k will. be: $42,873.60
<br />This price is for 198 sidewalk panels and 5 pedestrian ramps. The panel price is
<br />the same 1 ()OIG more or less according to spec sheet.
<br />
<br />3/P