Laserfiche WebLink
<br />CITY OF CENTERVILLE - 200g STREET AND UTILITY IMPROVEMENT PROJECT <br /> <br />Introduction <br /> <br />The City of Centerville has chosen to investigate the feasibility of performing improvements to rehabilitate <br />existing streets and to install new water mains as suggested in the 2003 Pavement Management Study. <br />This report is extremely important as the endeavor is wide reaching and costly, affeding more than 470 <br />homes with an estimated cost of $ 7.2 million. <br /> <br />The study, which evaluated the condition of all streets in town, set a recommended schedule of <br />improvements including, seal coats, overlays, and reconstructions, Also considered in the study, were <br />streets which were not yet serviced with City water main. Street improvement projects were proposed to <br />coincide with those utility installations. <br /> <br />The study proposed two seal coat projects, one in 2004 and the other scheduled for 2006. In 2004, the city <br />seal coated most of the streets recommended for said improvements in that year. The streets scheduled for <br />seal coating in 2006 have not yet been completed. <br /> <br />The study also laid out two street improvement projects, one scheduled for 2004, and the other for 2009. <br />In 2004, the city completed the scheduled street and utility improvement project. The project covered most <br />streets designated for that year by the study. The second of these projects is still scheduled to be completed <br />in 2009. In order to ensure recommendations of the 2003 study are still appropriate four years later, it has <br />been determined that all streets not reconstructed as part of the 2004 projed and those designated for <br />2009 reconstruction be reevaluated at this time. This study addresses those streets and their proposed <br />rehabilitation. <br /> <br />Street Improvements <br /> <br />The specific streets to be included within this study are listed below in Table 1 with their respective lengths. <br />The project affects nearly six miles of city streets. <br /> <br />Street <br />Name From To LF <br />Mound Trail* City Border 1200' NE 1200 <br />Mound Trail* 1200' NE of City Border CSAH 14 2250 <br />Cardinal Drive 20th Avenue N W Robin Lane 525 <br />Center Street Dupre Road 20th Avenue 2000 <br />Clearwater Drive Peltier Lake Dr CDS (S) 400 <br />Ivy Court Center Street CDS (N) 420 <br />Robin Lane N W Robin Lane 20th Avenue N 525 <br />Robin Lane S 20th Avenue N W Robin Lane 525 <br />Robin Lane W N Robin Lane S Robin Lane 500 <br /> <br />TABLE 1 - PROPOSED snEETS <br /> <br />City of CenterviIle <br />2009 Street and Utility Improvement Project <br /> <br />-#' Bonestroo <br /> <br />Project No: 616-07-]580 <br />Page 3 <br />