Laserfiche WebLink
<br />Lift Station #3 <br /> <br />It has been proposed that Centerville's lift station number three (LS #3) be eliminated and a new gravity <br />sanitary line be run from the lift station to lift station number four. A survey loop was run between the two <br />lift stations, confirming this is physically possible. <br /> <br />EXISTING CONDITIONS <br /> <br />Currently, LS #3 is operated and maintained by Centerville's public works staff. The lift station was installed <br />in 1987 and the pumps were replaced on the station in 1997 indicating a 10 year life span for these pumps. <br />This would lead us to the assumption that the existing pumps are likely nearing the end of their useful life. <br /> <br />The staff is spending approximately one hour of time per week at the lift station for maintenance needs. <br /> <br />PROPOSED IMPROVEMENTS <br /> <br />Flow entering LS #3 would be re routed in one of two directions. In Option 1, the outgoing pipe would run <br />south along the existing storm pond and then east along the south side of the development in the City's <br />existing utility easement. <br /> <br />Alternatively, the sewer could be relayed from LS #3 to the east, down Center Street. This would require re- <br />hooking services along the way but may be slightly shorter and would replace the existing sewer which is <br />about 20 years old. <br /> <br />The estimated project cost of each of these options is presented in Table 2. The proposed routes are shown <br />on Figure 10. <br /> <br />TABLE 3. ESTIMATED PROJECT COSTS FOR GRAVITY SEWER IN LIEU OF LS #3 <br /> <br />Option 1 - South Route Option 2 - Center Street Route <br />Item Cost Item Cost <br />Pipe, MHs, etc. (1700 LF @35/LF) $59,500 Pipe, MHs, etc. (1600 LF @35/LF) $56,000 <br />Jacking (under CSAH 54) $20,000 Jacking (under CSAH 54) $20,000 <br />Connect to LS $10,000 Connect to LS $10,000 <br />Reconnect Services $0 Reconnect Services $5,000 <br />Restoration (turf) $15,000 Restoration (turf) $1, 000 <br />Restoration (road - Fairview) $4,500 Restoration (road) * $- <br />Total $109,000 Total $92,000 <br /> <br />.THIS ASSUMES THERE ARE NO COSTS ASSOCIATED WITH RECONSTRUCTING THE ROADWAY SINCE THIS WORK IS <br />PART OF THE PROJECT REGARDLESS OF THE CHOSEN ROUTE DUE TO THE INSTALLATION OF NEW WATER MAIN. <br /> <br />OPERATION AND MAINTENANCE COSTS <br />Table 3 summarizes the annualized maintenance costs associated with operating LS #3. <br /> <br />TABLE 4 - ESTIMATED ANNUALIZED OPERATION AND MAINTENANCE COSTS FOR LS #3 <br /> <br />Item Cost Frequency Annualized Cost <br />Labor (daily check) $50 Weekly $2,600 <br />Labor (intermittent call-outs) $100 Monthly $1,200 <br /> <br />City of Centerville <br />2009 Street and Utility Improvement Project <br /> <br />.t; Bonestroo <br /> <br />Project No: 616-07-]580 <br />Page 22 <br />