Laserfiche WebLink
<br />Project Schedule <br /> <br />The following is a rough schedule for the project: <br /> <br />Feasibility Report Presented to Council <br />Public Open House <br />Revisions to Feasibility Report <br />Accept Feasibility Report <br />Preliminary Survey <br />Improvement Hearing <br />Plans and Specs <br />Easements, Permits <br />Finalize Plans <br />Receive Bids <br />Assessment Hearing <br />Award Contract <br />Begin Construction <br />Complete Construction <br />Water Service Hook-up Deadline* <br /> <br />September12, 2007 <br />October 4, 2007 <br />October 2007 <br />November 14, 2007 <br />November/December 2007 <br />January 2007 <br />January - March 2008 <br />April- July 2008 <br />July 2008 <br />September 2008 <br />October 2008 <br />November 2008 <br />Spring 2009 <br />Fall 2009 <br />Fall 2010 <br /> <br />* Assumes water service hook-ups are not part of the project and are the responsibility of the individual <br />homeowner. <br /> <br />Conclusions and Recommendations <br /> <br />It is the finding of this study that the proposed improvements are necessary, feasible and cost effective. The <br />following steps are recommended: <br /> <br />. Hold an informal Public Open House to introduce the project to the public. <br />. Adopt this report as the guide for development of the proposed improvements. <br />· Hold a Public Improvement Hearing. <br />. Order the preparation of plans and specifications. <br />· Take bids. <br />. Hold an Assessment Hearing <br />. Install the public utilities and streets, with construction anticipated to be completed in 2009. <br /> <br />If the City feels that the proposed improvements are too much to undertake in one year due to budgetary <br />constraints, it is recommended that the improvements be split. The logical way to separate the proposed <br />improvements would be in to two projects. The first would involve the reconstruction of all roads needing <br />water main, to be constructed in 2009. The remaining street improvements should then be completed in as <br />soon as budgets allow. <br /> <br />City of Centerville <br />2009 Street and Utility Improvement Project <br /> <br />.. Bonestroo <br /> <br />Project No: 616-07-1580 <br />Page 26 <br />