Laserfiche WebLink
<br /> Contract Unit Current Quantity Amount <br />No. Item Unit Quantity Price Quantity to Date to Date <br /> PART 6 - RAIN GARDEN AND SWALES: <br />44 RAIN GARDEN SWAlE WITH WASHED RIVER ROCK IF 77 36.50 62 $2,26300 <br />45 ORNAMENTAL SLAB LIMESTONE OUTCROPS / lEDGES / GROUPINGS lS 1 815000 0.25 1 $8,150.00 <br />46 4" PERFORATED POLYETHYLENE PIPE, INCl. AGGREGATE AND GEOFABRIC IF 74 1100 65 $715.00 <br /> TOTAL PART 6 - RAIN GARDEN AND SWALES: $11,128.00 <br /> PART 7 - ARTISAN WElL: <br />47 ARTISAN WEll- BASIN (POND LINER), STEPPED SWAlE WITH ORNAMENTAL <br /> SLAB lS 14100.00 0.15 $14,10000 <br />48 LIMESTONE OUTCROPS /lEDGES / GROUPINGS lS 1214000 0.15 $12,140.00 <br /> TOTAL PART 7 - ARTISAN WEll: $26,24000 <br /> PART 8 - LANDSCAPING: <br />49 RAIN GARDEN & SWAlE SHRUBS, FORBS, PERENNIALS, GRASSES, AND <br /> BLANKET lS 1 2772500 0.1 0.85 $23,566.25 <br />50 SODDING, LAWN TYPE SY 5000 350 3018 5568. $19,488.00 <br /> TOTAL PART 8 - lANDSCAPING: $43,05425 <br /> PART 9 - ELECTRICAL: <br />51 ELECTRIC WORK lS 1 10700.00 0.5 $10)0000 <br /> TOTAL PART 9 - ElECTRICAL: $10,70000 <br /> ALTERNATE 3 NO. - SHORELAND STABILIZATION/RENOVATION: <br />55 SHORElAND STABILIZATION / RENOVATION IF 7.20 88.00 40 220 $19,360.00 <br /> TOTAL AlTERNATE 3 NO. - SHORElAND STABILIZATION/RENOVATION: $19,360.00 <br /> <br />TOTAL PART 1 - SITE GRADING: <br />TOTAL PART 2 - WATER MAIN: <br />TOTAL PART 3 - STORM SEWER: <br />TOTAL PART 4 - TRAilS AND EQUIPMENT PADS: <br />TOTAL PART 5 - SITE FURNISHINGS: <br />TOTAL PART 6 - RAIN GARDEN AND SWALES: <br />TOTAL PART 7 - ARTISAN WEll: <br />TOTAL PART 8 - lANDSCAPING: <br />TOTAL PART 9 - ELECTRICAl: <br />TOTAL AlTERNATE 3 NO. - SHORElAND STABILIZATION/RENOVATION: <br /> <br />$65,28140 <br />$3,517.00 <br />$10,316.00 <br />$13,165.70 <br />$10,350.00 <br />$11,128.00 <br />$26,24000 <br />$43,05425 <br />$10,70000 <br />$19,36000 <br /> <br />TOTAL WORK COMPLETED TO DATE <br /> <br />$213,112.35 <br /> <br />61607155REQ3.x1s <br /> <br />~ <br />