Laserfiche WebLink
<br />DRAFT <br /> <br />3.8 Removal of Facilities at Exniration of Franchise. <br /> <br />At the expiration of the tenn tor which this Franchise is granted, or upon the expiration of <br />any renewal or extension period which may be granted, the City shall, subject to any <br />other lawful and valid authorizations the Grantee may have to usc the System in Public <br />Rights-ole Way, have the right to require the Grantee, at thc Grantee's sole expense: (i) to <br />remove all portions of the System from all Rights.ot~ Way within the City; and (ii) to <br />restore aHected sites to their original condition. Should the Grantee lail, refuse or neglect <br />to comply with the City's directivc, all portions of the System. or any patt thereol; may at <br />thc option of the City become the solc property oflhe City, alno expense to the Cily, or <br />be removed. altered or relocated by the City althe cosl of the Grantee. The City shall not <br />be liable to the Grantee lor damages resulting Irom such removal, alteration or relocation. <br /> <br />SECTION 4. DESIGN PROVISIONS <br /> <br />4.1 Svstem Caoacitv and Technical Dcs;!!n. <br /> <br />4.1.1 Attached hereto and incorporated herein as Exhibit A is a System Construction <br />schedule that complies with Minn. Stat. S 238.084, subd. I(rn). Upon completion <br />of the System Construction, the System generally shall have at least the tollowing <br />characteristics: <br /> <br />4.1.1.1 <br /> <br />4.1.1.2 <br /> <br />4.1.1.3 <br /> <br />a modern design when built, utilizing an architecture that will <br />permit additional improvements necessa'y tor high-quality and <br />reliable service throughout the Franchise term, and the capability <br />to operate continuously on a twenty-tour (24) hour a day basis <br />without severe material degradation during operating condi tions <br />typical to the Minneapol islSt. Paulmetropol itan area; <br /> <br />standby power generating capacity at the headend. 'rhe Grantee <br />shall maintain motorized standby power generators capable of <br />powering all headend equipment for at least twenty-lour (24) <br />hours. The back-up power supplies serving the System shall be <br />capable of providing power to the System for not less than three <br />(3) homs per occurrence measured on an annual basis according to <br />manufacturer specifications in the event of an electrical outage. <br />The Grantee shall maintain sufficient portable motorized <br />generators to be deployed in the event that the duration of a power <br />disruption is expected to exceed three (3) hours; <br /> <br />taeilities of good and durable quality, generally used in high. <br />quality, reliable systems or similar design; <br /> <br />17 <br /> <br />J3 <br />